RANK.AI DATA / LATEST PUBLICATION

Official AI Infrastructure investment disclosures

8 infrastructure projects ranked by disclosed infrastructure investment reference amount.
Amazon U.S. Federal AI & HPC Infrastructure is out in front at $50.

8 infrastructure projectschecked Sep 10, 2026, 3:50 AM UTCdailyhow we measure this →CSV / JSON

Follow changes
In front today

Amazon U.S. Federal AI & HPC Infrastructure

$50disclosed infrastructure investment reference amount

Ahead of second place
$30
Held by the top three
72%
Middle of the board
$10
Below half the leader
7 of 8
Highest $50Middle $10
1. Amazon U.S. Federal AI & HPC Infrastructure — $502. Amazon Pennsylvania AI & Cloud Infrastructure — $203. Amazon Northern Indiana Data Centers — $154. Amazon Richmond County AI & Cloud Infrastructure — $105. Meta Richland Parish Data Center — $106. CoreWeave Lancaster AI Data Center — $67. Microsoft Mount Pleasant Cloud & AI Infrastructure — $38. Amazon Warren County Mississippi Data Center — $3
Rank 1one bar per published rowRank 8
WHY THIS RANK / VERIFIED SNAPSHOT

Microsoft Mount Pleasant Cloud & AI Infrastructure

Ranks a reviewed primary-source project universe by each announcement's raw headline investment reference amount, with qualifiers and evidence links preserved.

Some explanation inputs are unavailable Missing: publicFrozenEvidence, comparablePriorRanking.

Published rank
#7
Score
3.3
Sample size
1

100% confidence · 10% component coverage · as of Sep 10, 2026, 3:50 AM UTC

SCORE CONSTRUCTION

Component ledger

1/10 evidenced
Components contributing to Microsoft Mount Pleasant Cloud & AI Infrastructure's rank
ComponentValueWeightContributionEvidenceStatus
capacityReferenceUnavailable0unavailableno_public_frozen_evidence
disclosed infrastructure investment USD100%3.31available
manifestVersion2026-07-27-v2Unavailable0unavailableno_public_frozen_evidence
notActualSpend1Unavailable0unavailableno_public_frozen_evidence
notAdditive1Unavailable0unavailableno_public_frozen_evidence
powerArrangementStatusUnavailable0unavailableno_public_frozen_evidence
projectStatusStructuredUnavailable0unavailableno_public_frozen_evidence
projectionScore3.3000000000Unavailable0unavailableno_public_frozen_evidence
rankingValue3300000000.0000000000Unavailable0unavailableno_public_frozen_evidence
rawValuesStructuredUnavailable0unavailableno_public_frozen_evidence
WHY IT MOVED

flat since prior snapshot

0 ranks

component_history_unavailable

No component moved since the prior snapshot.

PRIMARY EVIDENCE

Source trail

1 public records
  • Disclosed infrastructure investment reference amountdisclosed infrastructure investment USD · observed Sep 10, 2026, 3:50 AM UTC$3.3B100% confidence
    Source
    Official Company AI Infrastructure Disclosures
    Grade
    A
    Freshness
    fresh
    Locator
    {"canonicalUrl":"https://news.microsoft.com/source/2024/05/08/microsoft-announces-3-3-billion-investment-in-wisconsin-to-spur-artificial-intelligence-innovation-and-economic-growth/","anchorsVerified":true,"contentHashKind":"sha256_evidence_bundle","statusSourceUrl":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","sourceTextStored":false,"statusContentHash":"5b1141cfb06c2b9d7d3fbc9afc11aa1bf2effe62528d423d4f5b682186a0f8d5","primaryContentHash":"0ff29e3fe2029d08acfd984a6d3df630b84a1f26c2f79fe9cbe657208b6074ad","requiredFactAnchors":["3.3 billion","mount pleasant"],"statusAnchorsVerified":true,"statusRequiredFactAnchors":["fully operational","first datacenter facility"]}
    Open primary evidence ↗
REPRODUCIBILITYOfficial AI Infrastructure Investment Disclosures · v2-capacity-stage8 observations · 1 sources · passed quality
Snapshot
cfa77ffa-dc8e-4351-94c4-c837dca1f69a
Data hash
fb4a051b31bf484bc4862831376a4c31c5183b614bffd2dc98479d156338b253
Method hash
934c16d20ff31af3df7532a054dadbd85f7668e592c0268234499d208f3dbfde

More in Datacenters

Operating, under-construction, and planned AI capacity by place and operator.

3 live tables
Operational AI data centers

Epoch AI current positive-capacity facilities ranked by estimated total facility MW, with 2025-dollar capex and calculated H100-equivalent compute beside every row.

Planned AI data center capacity

Latest future-dated Epoch AI capacity milestone per facility, with planned MW, 2025-dollar capex, H100e, construction status, evidence, and uncertainty preserved.

State AI infrastructure pipeline

A reviewed first-party project cohort with announced, under-construction, and energized stages plus separately scoped disclosed datacenter and compute MW. Permits and grid queues are never inferred.