RANK.AI DATA / LATEST PUBLICATION

Official AI Infrastructure investment disclosures

8 infrastructure projects ranked by disclosed infrastructure investment reference amount.
Amazon U.S. Federal AI & HPC Infrastructure is out in front at $50.

8 infrastructure projectschecked Sep 10, 2026, 3:50 AM UTCdailyhow we measure this →CSV / JSON

Follow changes
In front today

Amazon U.S. Federal AI & HPC Infrastructure

$50disclosed infrastructure investment reference amount

Ahead of second place
$30
Held by the top three
72%
Middle of the board
$10
Below half the leader
7 of 8
Highest $50Middle $10
1. Amazon U.S. Federal AI & HPC Infrastructure — $502. Amazon Pennsylvania AI & Cloud Infrastructure — $203. Amazon Northern Indiana Data Centers — $154. Amazon Richmond County AI & Cloud Infrastructure — $105. Meta Richland Parish Data Center — $106. CoreWeave Lancaster AI Data Center — $67. Microsoft Mount Pleasant Cloud & AI Infrastructure — $38. Amazon Warren County Mississippi Data Center — $3
Rank 1one bar per published rowRank 8
WHY THIS RANK / VERIFIED SNAPSHOT

Amazon Warren County Mississippi Data Center

Ranks a reviewed primary-source project universe by each announcement's raw headline investment reference amount, with qualifiers and evidence links preserved.

Some explanation inputs are unavailable Missing: publicFrozenEvidence, comparablePriorRanking.

Published rank
#8
Score
3
Sample size
1

100% confidence · 10% component coverage · as of Sep 10, 2026, 3:50 AM UTC

SCORE CONSTRUCTION

Component ledger

1/10 evidenced
Components contributing to Amazon Warren County Mississippi Data Center's rank
ComponentValueWeightContributionEvidenceStatus
capacityReferenceUnavailable0unavailableno_public_frozen_evidence
disclosed infrastructure investment USD100%31available
manifestVersion2026-07-27-v2Unavailable0unavailableno_public_frozen_evidence
notActualSpend1Unavailable0unavailableno_public_frozen_evidence
notAdditive1Unavailable0unavailableno_public_frozen_evidence
powerArrangementStatusUnavailable0unavailableno_public_frozen_evidence
projectStatusStructuredUnavailable0unavailableno_public_frozen_evidence
projectionScore3.0000000000Unavailable0unavailableno_public_frozen_evidence
rankingValue3000000000.0000000000Unavailable0unavailableno_public_frozen_evidence
rawValuesStructuredUnavailable0unavailableno_public_frozen_evidence
WHY IT MOVED

flat since prior snapshot

0 ranks

component_history_unavailable

No component moved since the prior snapshot.

PRIMARY EVIDENCE

Source trail

1 public records
  • Disclosed infrastructure investment reference amountdisclosed infrastructure investment USD · observed Sep 10, 2026, 3:50 AM UTC$3B100% confidence
    Source
    Official Company AI Infrastructure Disclosures
    Grade
    A
    Freshness
    fresh
    Locator
    {"canonicalUrl":"https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment","anchorsVerified":true,"contentHashKind":"sha256_evidence_bundle","statusSourceUrl":"https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment","sourceTextStored":false,"statusContentHash":"e185a81786aba5be23c00f123d41e1ad4fbb6b36f62c7c74452faf1f9223bfd9","primaryContentHash":"e185a81786aba5be23c00f123d41e1ad4fbb6b36f62c7c74452faf1f9223bfd9","requiredFactAnchors":["3 billion","warren county"],"statusAnchorsVerified":true,"statusRequiredFactAnchors":["plans to invest","new data center campus"]}
    Open primary evidence ↗
REPRODUCIBILITYOfficial AI Infrastructure Investment Disclosures · v2-capacity-stage8 observations · 1 sources · passed quality
Snapshot
cfa77ffa-dc8e-4351-94c4-c837dca1f69a
Data hash
fb4a051b31bf484bc4862831376a4c31c5183b614bffd2dc98479d156338b253
Method hash
934c16d20ff31af3df7532a054dadbd85f7668e592c0268234499d208f3dbfde

More in Datacenters

Operating, under-construction, and planned AI capacity by place and operator.

3 live tables
Operational AI data centers

Epoch AI current positive-capacity facilities ranked by estimated total facility MW, with 2025-dollar capex and calculated H100-equivalent compute beside every row.

Planned AI data center capacity

Latest future-dated Epoch AI capacity milestone per facility, with planned MW, 2025-dollar capex, H100e, construction status, evidence, and uncertainty preserved.

State AI infrastructure pipeline

A reviewed first-party project cohort with announced, under-construction, and energized stages plus separately scoped disclosed datacenter and compute MW. Permits and grid queues are never inferred.