Epoch AI current positive-capacity facilities ranked by estimated total facility MW, with 2025-dollar capex and calculated H100-equivalent compute beside every row.
Official AI Infrastructure investment disclosures
8 infrastructure projects ranked by disclosed infrastructure investment reference amount.
Amazon U.S. Federal AI & HPC Infrastructure is out in front at $50.
8 infrastructure projectschecked Sep 10, 2026, 3:50 AM UTCdailyhow we measure this →CSV / JSON
Amazon U.S. Federal AI & HPC Infrastructure
$50disclosed infrastructure investment reference amount
- Ahead of second place
- $30
- Held by the top three
- 72%
- Middle of the board
- $10
- Below half the leader
- 7 of 8
Amazon Northern Indiana Data Centers
Ranks a reviewed primary-source project universe by each announcement's raw headline investment reference amount, with qualifiers and evidence links preserved.
Some explanation inputs are unavailable Missing: publicFrozenEvidence, comparablePriorRanking.
- Published rank
- #3
- Score
- 15
- Sample size
- 1
100% confidence · 10% component coverage · as of Sep 10, 2026, 3:50 AM UTC
Component ledger
| Component | Value | Weight | Contribution | Evidence | Status |
|---|---|---|---|---|---|
| capacityReference | 2400 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| disclosed infrastructure investment USD | — | 100% | 15 | 1 | available |
| manifestVersion | 2026-07-27-v2 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| notActualSpend | 1 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| notAdditive | 1 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| powerArrangementStatus | company_announced_utility_framework | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| projectStatus | Structured | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| projectionScore | 15.0000000000 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| rankingValue | 15000000000.0000000000 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| rawValues | Structured | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
flat since prior snapshot
component_history_unavailable
No component moved since the prior snapshot.
Source trail
Disclosed infrastructure investment reference amountdisclosed infrastructure investment USD · observed Sep 10, 2026, 3:50 AM UTC$15B100% confidence
- Source
- Official Company AI Infrastructure Disclosures
- Grade
- A
- Freshness
- fresh
- Locator
{"canonicalUrl":"https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers","anchorsVerified":true,"contentHashKind":"sha256_evidence_bundle","statusSourceUrl":"https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers","sourceTextStored":false,"statusContentHash":"7c5a1068243346b26d93743bc4fa77ae00af1f5dced6b582cd502d7eb4714224","primaryContentHash":"7c5a1068243346b26d93743bc4fa77ae00af1f5dced6b582cd502d7eb4714224","requiredFactAnchors":["15 billion","2.4 gigawatts"],"statusAnchorsVerified":true,"statusRequiredFactAnchors":["plans to invest","2.4 gigawatts"]}
More in Datacenters
Operating, under-construction, and planned AI capacity by place and operator.
Latest future-dated Epoch AI capacity milestone per facility, with planned MW, 2025-dollar capex, H100e, construction status, evidence, and uncertainty preserved.
A reviewed first-party project cohort with announced, under-construction, and energized stages plus separately scoped disclosed datacenter and compute MW. Permits and grid queues are never inferred.