RANK.AI DATA / LATEST PUBLICATION

Planned AI data center capacity

46 infrastructures ranked by facility power.
Microsoft Fairwater Wisconsin is out in front at 2,715 MW.

46 infrastructureschecked Sep 9, 2026, 12:00 PM UTCdailyhow we measure this →CSV / JSON

Follow changes
In front today

Microsoft Fairwater Wisconsin

2,715 MWfacility power

Ahead of second place
265
Held by the top three
19%
Middle of the board
480.5
Below half the leader
37 of 46
Highest 2,715 MWMiddle 480.5
1. Microsoft Fairwater Wisconsin — 2,715 MW2. OpenAI Stargate New Mexico — 2,450 MW3. Anthropic-Amazon New Carlisle — 2,310 MW4. Meta Hyperion — 2,262 MW5. Colossus 2 — 2,065 MW6. OpenAI Stargate Shackelford — 1,960 MW7. QTS Cedar Rapids — 1,587 MW8. OpenAI Stargate UAE — 1,400 MW9. OpenAI Stargate Michigan — 1,383 MW10. OpenAI Stargate Wisconsin — 1,300 MW11. Goodnight — 1,294.1 MW12. OpenAI Stargate Milam — 1,200 MW13. OpenAI Stargate Abilene — 1,180 MW14. Meta Prometheus — 1,110 MW15. Google Fort Wayne — 1,035 MW16. Amazon Ridgeland — 1,008 MW17. Crusoe Abilene Expansion — 941 MW18. Amazon Madison Mega Site — 819 MW19. Coreweave Helios — 800 MW20. VNET Bayin Ulanqab — 798 MW21. DayOne Nusajaya — 662 MW22. CoreWeave Ellendale ND — 520 MW23. STACK Infrastructure NVA02 — 487 MW24. Google Omaha — 474 MW25. Meta Montgomery — 465 MW26. Google Columbus — 464 MW27. Anthropic Lake Mariner — 441 MW28. QTS Eagle Mountain — 411 MW29. AWS New Albany — 405 MW30. CoreWeave Denton TX — 395 MW31. Google Storey County — 389 MW32. Google Lincoln — 339 MW33. QTS Richmond 3 — 336 MW34. Google Cedar Rapids — 314 MW35. Anthropic Barber Lake — 300 MW36. OpenAI Stargate Lordstown — 300 MW37. Start Campus Sines Data Campus — 280 MW38. Stream Phoenix — 267 MW39. Meta Cheyenne — 264 MW40. Meta Temple — 231 MW41. AWS Berwick — 212 MW42. CoreWeave Chester VA — 197 MW43. Google Red Oak — 185 MW44. CoreWeave Muskogee OK — 181 MW45. Vantage TX1 — 179.2 MW46. Microsoft Narvik Norway — 124 MW
Rank 1one bar per published rowRank 46
WHY THIS RANK

EXPLANATION UNAVAILABLE

The explanation service did not return a publishable result.

More in Datacenters

Operating, under-construction, and planned AI capacity by place and operator.

3 live tables
Operational AI data centers

Epoch AI current positive-capacity facilities ranked by estimated total facility MW, with 2025-dollar capex and calculated H100-equivalent compute beside every row.

State AI infrastructure pipeline

A reviewed first-party project cohort with announced, under-construction, and energized stages plus separately scoped disclosed datacenter and compute MW. Permits and grid queues are never inferred.