Rank.ai
Menu
Live
RANK.AI / PUBLISHED METHOD

Epoch AI: ai-data-centers-planned

Latest future-dated timeline milestone per center after the dataset release date, requiring positive power, capital cost, and H100-equivalent values.

Version
1.1.0
Published
Jul 27, 2026
Live boards
1
Method ID
epoch-ai-data-centers-planned

Where the facts come from

Source

Epoch AI open datasets

How the order is produced

Direction

descending

Tie Breaker

entity slug ascending

When the method reruns

  • daily

Boards using this version

Only live, quality-gated boards appear. Each board opens on the exact published table and evidence path.

BoardPrimary measureRowsConfidenceFreshnessBoard versionCadenceEvidence
Planned AI Data Center Capacityai-data-centers-plannedepoch-ai-data-center-facility-power-mw44100% current1.1.0dailyOpen board →

Complete measurement ledger

These fields are stored with the methodology version. A changed contract must publish a new version before comparable movement can resume.

Score

planned facility MW

Source

Epoch AI open datasets

License

CC BY 4.0

Ranking

Direction

descending

Tie Breaker

entity slug ascending

Selection

Latest future-dated timeline milestone per center after the dataset release date, requiring positive power, capital cost, and H100-equivalent values.

Attribution

Source: Epoch AI (CC BY 4.0)

Limitations

  • Future milestones are estimates, not contracted utility load.
  • Planned does not imply permitted, financed, or energized.
  • The milestone date and construction-status text remain visible.

Missing Values

Missing, blank, excluded, or incomplete values are omitted and are never converted to zero.

Release Contract

Schema Mode

exact ordered CSV headers

Release Rollback

reject

Release Date Required

Yes

Raw Bytes Sha256 Required

Yes

Same Release Hash Mutation

reject

Epoch AI: ai-data-centers-planned | Rank.ai