| Metric | Value | As of | Evidence | Confidence |
|---|---|---|---|---|
| ai_data_centersFacility capital cost | $38.11Bestimated | Jul 25, 2026 | Epoch AI open datasets ↗Grade A | 60% |
| ai_data_centersFacility power | 1,294.1 MWestimated | Jul 25, 2026 | Epoch AI open datasets ↗Grade A | 60% |
| ai_data_centersH100-equivalent compute | 2.01M H100eestimated | Jul 25, 2026 | Epoch AI open datasets ↗Grade A | 60% |
Every currently published position, joined to its snapshot, confidence, and methodology version.
| Rank | Leaderboard | Score | Movement | Confidence | As of | Method | Open explanation |
|---|---|---|---|---|---|---|---|
| #10 | Planned AI Data Center Capacityai-data-centers-planned | 1,294.1 | — | 60% | Jul 25, 2026 | v1.0.0 | Explain → |
Latest future-dated timeline milestone per center after the dataset release date, requiring positive power, capital cost, and H100-equivalent values.
Some explanation inputs are unavailable Missing: publicFrozenEvidence, comparablePriorRanking.
| Component | Value | Weight | Contribution | Evidence | Status |
|---|---|---|---|---|---|
| attribution | Source: Epoch AI (CC BY 4.0) | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| epoch ai data center capex 2025 usd | 38109291999.9999960000 | 0% | 0 | 1 | available |
| epoch ai data center facility power mw | 1294.1000000000 | 100% | 1,294.1 | 1 | available |
3 published observations for Goodnight. Open a row for the source, evidence location, extraction method, and quality state.
| Metric | Value | Kind | As of | Confidence | Evidence |
|---|---|---|---|---|---|
| H100-equivalent computeepoch-ai-data-center-h100-equivalents | 2,011,116.7256H100e | estimated | Jul 25, 2026 | 60% | View source
|
| Facility powerepoch-ai-data-center-facility-power-mw | 1,294.1MW | estimated | Jul 25, 2026 | 60% | View source
|
| epoch ai data center h100 equivalents | 2011116.7256189995 | 0% | 0 | 1 | available |
|---|
| evidence | — | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
|---|
| missingIsZero | 0 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
|---|
| rawValue | 1294.1000000000 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
|---|
| score | 1294.1000000000 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
|---|
no_prior_published_snapshot
No comparable component drivers were published.
{"rowCount":424,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-07-25","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"8975f0376b161ea94138e8cda285dc8dc9befdd379409252ddca0939553045d2"}{"rowCount":424,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-07-25","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"8975f0376b161ea94138e8cda285dc8dc9befdd379409252ddca0939553045d2"}{"rowCount":424,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-07-25","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"8975f0376b161ea94138e8cda285dc8dc9befdd379409252ddca0939553045d2"}{"rowCount":424,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-07-25","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"8975f0376b161ea94138e8cda285dc8dc9befdd379409252ddca0939553045d2"}| Facility capital costepoch-ai-data-center-capex-2025-usd | 38,109,292,000USD · USD_2025 | estimated | Jul 25, 2026 | 60% | View source
|
|---|