Epoch AI current positive-capacity facilities ranked by estimated total facility MW, with 2025-dollar capex and calculated H100-equivalent compute beside every row.
Planned AI data center capacity
46 infrastructures ranked by facility power.
Microsoft Fairwater Wisconsin is out in front at 2,715 MW.
46 infrastructureschecked Sep 9, 2026, 12:00 PM UTCdailyhow we measure this →CSV / JSON
Microsoft Fairwater Wisconsin
2,715 MWfacility power
- Ahead of second place
- 265
- Held by the top three
- 19%
- Middle of the board
- 480.5
- Below half the leader
- 37 of 46
DayOne Nusajaya
Latest future-dated timeline milestone per center after the dataset release date, requiring positive power, capital cost, and H100-equivalent values.
Some explanation inputs are unavailable Missing: publicFrozenEvidence, comparablePriorRanking.
- Published rank
- #21
- Score
- 662 MW
- Sample size
- 3
60% confidence · 38% component coverage · as of Sep 9, 2026, 12:00 PM UTC
Component ledger
| Component | Value | Weight | Contribution | Evidence | Status |
|---|---|---|---|---|---|
| attribution | Source: Epoch AI (CC BY 4.0) | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| epoch AI data center capex 2025 USD | 17918186000.0000000000 | 0% | 0 | 1 | available |
| epoch AI data center facility power MW | 662.0000000000 | 100% | 662 | 1 | available |
| epoch AI data center h100 equivalents | 583836.7862556847 | 0% | 0 | 1 | available |
| evidence | — | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| missingIsZero | 0 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| rawValue | 662.0000000000 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| score | 662.0000000000 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
flat since prior snapshot
component_history_unavailable
No component moved since the prior snapshot.
Source trail
Facility capital costepoch AI data center capex 2025 USD · observed Sep 9, 2026, 12:00 PM UTC$17.92B60% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":499,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-09-09","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"2d6fb39d3552f0fe53ac7e7b0bccb607a9efbb705036189f9776764048656c60"}
Facility powerepoch AI data center facility power MW · observed Sep 9, 2026, 12:00 PM UTC662 MW60% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":499,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-09-09","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"2d6fb39d3552f0fe53ac7e7b0bccb607a9efbb705036189f9776764048656c60"}
H100-equivalent computeepoch AI data center h100 equivalents · observed Sep 9, 2026, 12:00 PM UTC583,836.786 H100e60% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":499,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-09-09","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"2d6fb39d3552f0fe53ac7e7b0bccb607a9efbb705036189f9776764048656c60"}
More in Datacenters
Operating, under-construction, and planned AI capacity by place and operator.
Reviewed first-party project announcements ranked by disclosed reference amount, with qualifiers preserved and actual spend explicitly separated.
A reviewed first-party project cohort with announced, under-construction, and energized stages plus separately scoped disclosed datacenter and compute MW. Permits and grid queues are never inferred.