Epoch AI current positive-capacity facilities ranked by estimated total facility MW, with 2025-dollar capex and calculated H100-equivalent compute beside every row.
Planned AI data center capacity by state
19 places ranked by planned facility power.
Texas is out in front at 7,165.3 MW.
19 of 51 placeschecked Sep 9, 2026, 12:00 PM UTCdailyhow we measure this →CSV / JSON
Texas
7,165.3 MWplanned facility power
- Ahead of second place
- 3,150.3
- Held by the top three
- 45%
- Middle of the board
- 1,383
- Below half the leader
- 17 of 19
Utah
Sums the latest future-milestone facility MW in Epoch AI by explicit source-provided U.S. state.
Some explanation inputs are unavailable Missing: publicFrozenEvidence.
- Published rank
- #16
- Score
- 411 MW
- Sample size
- 3
60% confidence · 50% component coverage · as of Sep 9, 2026, 12:00 PM UTC
Component ledger
| Component | Value | Weight | Contribution | Evidence | Status |
|---|---|---|---|---|---|
| attribution | Source: Epoch AI (CC BY 4.0) | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| capacityIsEstimatedNotMetered | 1 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| epoch planned capex by state 2025 USD | 11516128000 | 0% | 0 | 1 | available |
| epoch planned data center count by state | 1 | 0% | 0 | 1 | available |
| epoch planned facility power by state MW | 411 | 100% | 411 | 1 | available |
| epoch planned h100e by state | 346968.1657402729 | 0% | 0 | 1 | available |
| epoch planned owner count by state | 0 | 0% | 0 | 1 | available |
| missingIsZero | 0 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| owners | — | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| plannedCenters | — | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| plannedDoesNotMeanPermitted | 1 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| source center:data center qts eagle mountain:4ddff292 1afe 4b4a bd44 80bed4cef389 | — | 0% | 0 | 1 | available |
| source center:data center qts eagle mountain:51019e53 717d 4904 999f 9a087d4ba102 | — | 0% | 0 | 1 | available |
| source center:data center qts eagle mountain:cc28ac39 cf93 4cb1 9ff6 56494c1f430e | — | 0% | 0 | 1 | available |
| sourceSnapshotId | 97c0dcd7-1956-4f86-904f-488d4bf22ffd | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| stateCode | UT | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
flat since prior snapshot
No component moved since the prior snapshot.
Source trail
Planned facility capital costepoch planned capex by state 2025 USD · observed Sep 9, 2026, 12:00 PM UTC11,516,128,000 USD_202560% confidence
- Source
- Rank.ai Epoch planned-capacity state rollup
- Grade
- B
- Freshness
- fresh
- Locator
{"sourceSnapshotId":"97c0dcd7-1956-4f86-904f-488d4bf22ffd","sourceArtifactIds":["9f87a991-2163-46c6-a939-e5d8d40e0150","9f87a991-2163-46c6-a939-e5d8d40e0150","9f87a991-2163-46c6-a939-e5d8d40e0150"],"sourceObservationIds":["be1cc6f0-96b3-4ea3-b2ae-674c3fded4af","c725d9d4-f076-4567-8cbe-0c03fd99630a","fd1e5eb1-9a59-4641-aae3-29d66f582098"]}
Planned AI data centersepoch planned data center count by state · observed Sep 9, 2026, 12:00 PM UTC1 centers60% confidence
- Source
- Rank.ai Epoch planned-capacity state rollup
- Grade
- B
- Freshness
- fresh
- Locator
{"sourceSnapshotId":"97c0dcd7-1956-4f86-904f-488d4bf22ffd","sourceArtifactIds":["9f87a991-2163-46c6-a939-e5d8d40e0150","9f87a991-2163-46c6-a939-e5d8d40e0150","9f87a991-2163-46c6-a939-e5d8d40e0150"],"sourceObservationIds":["be1cc6f0-96b3-4ea3-b2ae-674c3fded4af","c725d9d4-f076-4567-8cbe-0c03fd99630a","fd1e5eb1-9a59-4641-aae3-29d66f582098"]}
Planned facility powerepoch planned facility power by state MW · observed Sep 9, 2026, 12:00 PM UTC411 MW60% confidence
- Source
- Rank.ai Epoch planned-capacity state rollup
- Grade
- B
- Freshness
- fresh
- Locator
{"sourceSnapshotId":"97c0dcd7-1956-4f86-904f-488d4bf22ffd","sourceArtifactIds":["9f87a991-2163-46c6-a939-e5d8d40e0150","9f87a991-2163-46c6-a939-e5d8d40e0150","9f87a991-2163-46c6-a939-e5d8d40e0150"],"sourceObservationIds":["be1cc6f0-96b3-4ea3-b2ae-674c3fded4af","c725d9d4-f076-4567-8cbe-0c03fd99630a","fd1e5eb1-9a59-4641-aae3-29d66f582098"]}
Planned H100-equivalent computeepoch planned h100e by state · observed Sep 9, 2026, 12:00 PM UTC346,968.166 H100e60% confidence
- Source
- Rank.ai Epoch planned-capacity state rollup
- Grade
- B
- Freshness
- fresh
- Locator
{"sourceSnapshotId":"97c0dcd7-1956-4f86-904f-488d4bf22ffd","sourceArtifactIds":["9f87a991-2163-46c6-a939-e5d8d40e0150","9f87a991-2163-46c6-a939-e5d8d40e0150","9f87a991-2163-46c6-a939-e5d8d40e0150"],"sourceObservationIds":["be1cc6f0-96b3-4ea3-b2ae-674c3fded4af","c725d9d4-f076-4567-8cbe-0c03fd99630a","fd1e5eb1-9a59-4641-aae3-29d66f582098"]}
Distinct disclosed ownersepoch planned owner count by state · observed Sep 9, 2026, 12:00 PM UTC0 owners60% confidence
- Source
- Rank.ai Epoch planned-capacity state rollup
- Grade
- B
- Freshness
- fresh
- Locator
{"sourceSnapshotId":"97c0dcd7-1956-4f86-904f-488d4bf22ffd","sourceArtifactIds":["9f87a991-2163-46c6-a939-e5d8d40e0150","9f87a991-2163-46c6-a939-e5d8d40e0150","9f87a991-2163-46c6-a939-e5d8d40e0150"],"sourceObservationIds":["be1cc6f0-96b3-4ea3-b2ae-674c3fded4af","c725d9d4-f076-4567-8cbe-0c03fd99630a","fd1e5eb1-9a59-4641-aae3-29d66f582098"]}
Facility capital costsource center:data center qts eagle mountain:4ddff292 1afe 4b4a bd44 80bed4cef389 · observed Sep 9, 2026, 12:00 PM UTC$11.52B60% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":499,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-09-09","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"2d6fb39d3552f0fe53ac7e7b0bccb607a9efbb705036189f9776764048656c60"}
Facility powersource center:data center qts eagle mountain:51019e53 717d 4904 999f 9a087d4ba102 · observed Sep 9, 2026, 12:00 PM UTC411 MW60% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":499,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-09-09","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"2d6fb39d3552f0fe53ac7e7b0bccb607a9efbb705036189f9776764048656c60"}
H100-equivalent computesource center:data center qts eagle mountain:cc28ac39 cf93 4cb1 9ff6 56494c1f430e · observed Sep 9, 2026, 12:00 PM UTC346,968.166 H100e60% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":499,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-09-09","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"2d6fb39d3552f0fe53ac7e7b0bccb607a9efbb705036189f9776764048656c60"}
More in Datacenters
Operating, under-construction, and planned AI capacity by place and operator.
Latest future-dated Epoch AI capacity milestone per facility, with planned MW, 2025-dollar capex, H100e, construction status, evidence, and uncertainty preserved.
Reviewed first-party project announcements ranked by disclosed reference amount, with qualifiers preserved and actual spend explicitly separated.