Epoch AI Planned Capacity by U.S. State
Sums the latest future-milestone facility MW in Epoch AI by explicit source-provided U.S. state.
- Version
- 1-epoch-us-state-name-address-v1-2026-07-27
- Published
- Jul 27, 2026
- Live boards
- 1
- Method ID
- epoch-planned-ai-capacity-by-us-state
Where the facts come from
- Source
epoch-ai-open-data
- Source Board
ai-data-centers-planned
How the order is produced
- Direction
descending
- Tie Breakers
- epoch-planned-data-center-count-by-state
- stateName
- Primary Metric
epoch-planned-facility-power-by-state-mw
When the method reruns
- daily_after_source_snapshot
Boards using this version
Only live, quality-gated boards appear. Each board opens on the exact published table and evidence path.
| Board | Primary measure | Rows | Confidence | Freshness | Board version | Cadence | Evidence |
|---|---|---|---|---|---|---|---|
| Planned AI Data Center Capacity by Stateplanned-capacity-by-state | epoch-planned-facility-power-by-state-mw | 16 | 100% | current | 1-epoch-us-state-name-address-v1-2026-07-27 | daily_after_source_snapshot | Open board → |
Complete measurement ledger
These fields are stored with the methodology version. A changed contract must publish a new version before comparable movement can resume.
Source
epoch-ai-open-data
License
CC BY 4.0
Ranking
- Direction
descending
- Tie Breakers
- epoch-planned-data-center-count-by-state
- stateName
- Primary Metric
epoch-planned-facility-power-by-state-mw
Universe
The latest published Epoch AI planned-capacity snapshot. Only United States facilities with one explicit state in the source-provided facility name or address are included.
Geography
- Method
Deterministic parsing of explicit U.S. state names or postal abbreviations in Epoch's facility name and address fields.
- Geocoding Used
No
- Non Us Facilities
excluded
- City Or County Inference Used
No
- Ambiguous Or Missing Locations
excluded
Selection
- Missing As Zero
No
- Required Metrics
- epoch-ai-data-center-facility-power-mw
- epoch-ai-data-center-capex-2025-usd
- epoch-ai-data-center-h100-equivalents
- Source Snapshot Status
published
- Positive Values Required
Yes
- Future Dated Timeline Required
Yes
- Minimum Resolved Us Location Coverage
0.75
Aggregation
- Epoch Planned H100e By State
sum of Epoch-calculated H100-equivalent capacity for the same distinct facility entities
- Epoch Planned Owner Count By State
count of distinct non-empty source owner labels
- Epoch Planned Capex By State 2025 Usd
sum of constant-2025-USD facility capital-cost estimates for the same distinct facility entities
- Epoch Planned Data Center Count By State
count of distinct included source facility entities
- Epoch Planned Facility Power By State Mw
sum of latest future-milestone facility MW for distinct source facility entities
Attribution
Source: Epoch AI (CC BY 4.0)
Limitations
- Planned facility MW is estimated capacity, not metered usage.
- Planned does not mean permitted, financed, contracted, or energized.
- H100e is a calculated compute equivalent, not a physical GPU count.
- Capital cost is an Epoch estimate in constant 2025 U.S. dollars.
- Facilities without an explicit source state are excluded, not geocoded.
- This board inherits Epoch AI's facility universe and update cadence.
Source Board
ai-data-centers-planned
Location Parser Version
epoch-us-state-name-address-v1-2026-07-27