Epoch AI Planned Capacity by U.S. State

Sums the latest future-milestone facility MW in Epoch AI by explicit source-provided U.S. state.

1-epoch-us-state-name-address-v1-2026-07-27

Version

Oct 20, 2026

Published

1

Board

epoch-planned-ai-capacity-by-us-state

Method ID

Where the facts come from

Source

epoch-ai-open-data

Source Board

ai-data-centers-planned

How the order is produced

Direction

descending

Tie Breakers
  • epoch-planned-data-center-count-by-state
  • stateName
Primary Metric

epoch-planned-facility-power-by-state-mw

When the method reruns

Each board shows the date of the snapshot it is built from.

Boards

Boards using this version

BoardPrimary measureRowsConfidenceSnapshotBoard versionRefreshBoard
States with the most datacenters plannedepoch-planned-facility-power-by-state-mw20100%Oct 20, 20261-epoch-us-state-name-address-v1-2026-07-27Not statedOpen the board: States with the most datacenters planned

Versioned contract

Complete measurement ledger

Source

epoch-ai-open-data

License

CC BY 4.0

Ranking

Direction

descending

Tie Breakers
  • epoch-planned-data-center-count-by-state
  • stateName
Primary Metric

epoch-planned-facility-power-by-state-mw

Universe

The latest published Epoch AI planned-capacity snapshot. Only United States facilities with one explicit state in the source-provided facility name or address are included.

Geography

Method

Deterministic parsing of explicit U.S. state names or postal abbreviations in Epoch's facility name and address fields.

Geocoding Used

No

Non Us Facilities

excluded

City Or County Inference Used

No

Ambiguous Or Missing Locations

excluded

Selection

Missing As Zero

No

Required Metrics
  • epoch-ai-data-center-facility-power-mw
  • epoch-ai-data-center-capex-2025-usd
  • epoch-ai-data-center-h100-equivalents
Source Snapshot Status

published

Positive Values Required

Yes

Future Dated Timeline Required

Yes

Minimum Resolved Us Location Coverage

0.75

Aggregation

Epoch Planned H100e By State

sum of Epoch-calculated H100-equivalent capacity for the same distinct facility entities

Epoch Planned Owner Count By State

count of distinct non-empty source owner labels

Epoch Planned Capex By State 2025 Usd

sum of constant-2025-USD facility capital-cost estimates for the same distinct facility entities

Epoch Planned Data Center Count By State

count of distinct included source facility entities

Epoch Planned Facility Power By State Mw

sum of latest future-milestone facility MW for distinct source facility entities

Attribution

Source: Epoch AI (CC BY 4.0)

Limitations

  • Planned facility MW is estimated capacity, not metered usage.
  • Planned does not mean permitted, financed, contracted, or energized.
  • H100e is a calculated compute equivalent, not a physical GPU count.
  • Capital cost is an Epoch estimate in constant 2025 U.S. dollars.
  • Facilities without an explicit source state are excluded, not geocoded.
  • This board inherits Epoch AI's facility universe and update cadence.

Source Board

ai-data-centers-planned

Location Parser Version

epoch-us-state-name-address-v1-2026-07-27

Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.

  • Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
  • Who gets namedEvery competitor in the answers, most named first.
  • The pages AI readsThe sources behind each answer.
  • Three fixesWhat to fix first, with a brief for the first article.