Epoch AI current positive-capacity facilities ranked by estimated total facility MW, with 2025-dollar capex and calculated H100-equivalent compute beside every row.
Datacenters
Planned AI data center capacity by state
6,934.3 MW
Texas ranks first
Planned facility power
20
Places ranked
of 51 tracked; the rest are below the quality bar
Oct 20
Snapshot recorded
2026
All 20 places by planned facility power
Texas leads at 6,934.3 MW; the middle of the board sits at 1,201.5.
- Ahead of second place
- 2,919.3
- Held by the top three
- 42%
- Middle of the board
- 1,201.5
- Below half the leader
- 18 of 20
- 1Texas6,934.3 MW
- 2Wisconsin4,015 MW
- 3Indiana3,345 MW
- 4New Mexico2,723 MW
- 5Ohio2,662 MW
- 6Louisiana2,203 MW
- 7Tennessee2,065 MW
- 8Iowa1,901 MW
- 9Mississippi1,827 MW
- 10Michigan1,383 MW
- 11Virginia1,020 MW
- 12Nebraska813 MW
- 13North Dakota520 MW
- 14Alabama465 MW
- 15New York441 MW
- 16Utah411 MW
- 17Pennsylvania336 MW
- 18Wyoming249 MW
- 19Oklahoma181 MW
- 20South Carolina168 MW
planned centers: 1 on 10 of 20 rows · owners: 1 on 14 of 20 rows · 60% confidence across rows.
| Rank | Name | Planned facility power | State | Planned CapEx | Planned H100e | Why |
|---|---|---|---|---|---|---|
| 01 | Texas | 6,934.3 MW | TX | $189.9B | 10.9M H100e | This rank |
| 02 | Wisconsin | 4,015 MW | WI | $119.9B | 7.2M H100e | This rank |
| 03 | Indiana | 3,345 MW | IN | $105.62B | 4.7M H100e | This rank |
| 04 | New Mexico | 2,723 MW | NM | $74.55B | 6M H100e | This rank |
| 05 | Ohio | 2,662 MW | OH | $77.43B | 3.1M H100e | This rank |
| 06 | Louisiana | 2,203 MW | LA | $61.82B | 4.1M H100e | This rank |
| 07 | Tennessee | 2,065 MW | TN | $58B | 1.8M H100e | This rank |
| 08 | Iowa | 1,901 MW | IA | $52.81B | 4.3M H100e | This rank |
| 09 | Mississippi | 1,827 MW | MS | $57.69B | 1.3M H100e | This rank |
| 10 | Michigan | 1,383 MW | MI | $37.43B | 2.9M H100e | This rank |
| 11 | Virginia | 1,020 MW | VA | $26.56B | 667.5K H100e | This rank |
| 12 | Nebraska | 813 MW | NE | $25.68B | 1.6M H100e | This rank |
| 13 | North Dakota | 520 MW | ND | $15.15B | 505.3K H100e | This rank |
| 14 | Alabama | 465 MW | AL | $13.56B | 407.5K H100e | This rank |
| 15 | New York | 441 MW | NY | $14.32B | 527.1K H100e | This rank |
| 16 | Utah | 411 MW | UT | $11.52B | 347K H100e | This rank |
| 17 | Pennsylvania | 336 MW | PA | $9.89B | 378K H100e | This rank |
| 18 | Wyoming | 249 MW | WY | $7.84B | 236K H100e | This rank |
| 19 | Oklahoma | 181 MW | OK | $5.8B | 198.1K H100e | Showing |
| 20 | South Carolina | 168 MW | SC | $4.89B | 147K H100e | This rank |
Why this rank
Oklahoma on Planned AI Data Center Capacity by State
Some explanation inputs are unavailable. Not published: the evidence frozen with this snapshot.
Sums the latest future-milestone facility MW in Epoch AI by explicit source-provided U.S. state.
19
Rank on this board
181 MW
Score
3
Inputs behind the score
60% confidence · 1 of 1 components evidenced
What the score is built from
1 of 1 evidencedEvery component evidenced · 1 evidence record each
| Component | Value | Contribution |
|---|---|---|
| Planned facility power by state MW | 181 | 181 |
Unchanged since the previous snapshot
No change in rankNo component moved since the previous snapshot.
Where each number comes from
8 public recordsPlanned facility capital costPlanned capex by state 2025 · observed Oct 20, 2026, 12:00 PM UTC5,795,946,000 USD_202560% confidence
- Source
- Rank.ai Epoch planned-capacity state rollup
- Grade
- B
- Freshness
- fresh
- Locator
{"sourceSnapshotId":"4ae3fdf7-e727-4448-a2a0-130bef49aefa","sourceArtifactIds":["60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462"],"sourceObservationIds":["1afe7197-9695-4359-bc52-50d4ef2dccb1","73debff4-2750-4311-a2a1-90dcc52403c4","e62115aa-8abd-4ccf-b779-2f61e79fafe7"]}
Planned AI data centersPlanned data center count by state · observed Oct 20, 2026, 12:00 PM UTC1 centers60% confidence
- Source
- Rank.ai Epoch planned-capacity state rollup
- Grade
- B
- Freshness
- fresh
- Locator
{"sourceSnapshotId":"4ae3fdf7-e727-4448-a2a0-130bef49aefa","sourceArtifactIds":["60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462"],"sourceObservationIds":["1afe7197-9695-4359-bc52-50d4ef2dccb1","73debff4-2750-4311-a2a1-90dcc52403c4","e62115aa-8abd-4ccf-b779-2f61e79fafe7"]}
Planned facility powerPlanned facility power by state MW · observed Oct 20, 2026, 12:00 PM UTC181 MW60% confidence
- Source
- Rank.ai Epoch planned-capacity state rollup
- Grade
- B
- Freshness
- fresh
- Locator
{"sourceSnapshotId":"4ae3fdf7-e727-4448-a2a0-130bef49aefa","sourceArtifactIds":["60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462"],"sourceObservationIds":["1afe7197-9695-4359-bc52-50d4ef2dccb1","73debff4-2750-4311-a2a1-90dcc52403c4","e62115aa-8abd-4ccf-b779-2f61e79fafe7"]}
Planned H100-equivalent computePlanned H100E by state · observed Oct 20, 2026, 12:00 PM UTC198,079.838 H100e60% confidence
- Source
- Rank.ai Epoch planned-capacity state rollup
- Grade
- B
- Freshness
- fresh
- Locator
{"sourceSnapshotId":"4ae3fdf7-e727-4448-a2a0-130bef49aefa","sourceArtifactIds":["60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462"],"sourceObservationIds":["1afe7197-9695-4359-bc52-50d4ef2dccb1","73debff4-2750-4311-a2a1-90dcc52403c4","e62115aa-8abd-4ccf-b779-2f61e79fafe7"]}
Distinct disclosed ownersPlanned owner count by state · observed Oct 20, 2026, 12:00 PM UTC1 owners60% confidence
- Source
- Rank.ai Epoch planned-capacity state rollup
- Grade
- B
- Freshness
- fresh
- Locator
{"sourceSnapshotId":"4ae3fdf7-e727-4448-a2a0-130bef49aefa","sourceArtifactIds":["60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462"],"sourceObservationIds":["1afe7197-9695-4359-bc52-50d4ef2dccb1","73debff4-2750-4311-a2a1-90dcc52403c4","e62115aa-8abd-4ccf-b779-2f61e79fafe7"]}
Facility capital costSource center:data center coreweave muskogee ok:4ddff292 1afe 4b4a bd44 80bed4cef389 · observed Oct 20, 2026, 12:00 PM UTC$5.8B60% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":567,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-10-20","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"40bcdc602d20546fb253629beb3f25ee4df294388d5614986572e3d7ef4e1396"}
Facility powerSource center:data center coreweave muskogee ok:51019e53 717d 4904 999f 9a087d4ba102 · observed Oct 20, 2026, 12:00 PM UTC181 MW60% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":567,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-10-20","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"40bcdc602d20546fb253629beb3f25ee4df294388d5614986572e3d7ef4e1396"}
H100-equivalent computeSource center:data center coreweave muskogee ok:cc28ac39 cf93 4cb1 9ff6 56494c1f430e · observed Oct 20, 2026, 12:00 PM UTC198,079.838 H100e60% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":567,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-10-20","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"40bcdc602d20546fb253629beb3f25ee4df294388d5614986572e3d7ef4e1396"}
More in Datacenters
Operating, under-construction, and planned AI capacity by place and operator.
Latest future-dated Epoch AI capacity milestone per facility, with planned MW, 2025-dollar capex, H100e, construction status, evidence, and uncertainty preserved.
Reviewed first-party project announcements ranked by disclosed reference amount, with qualifiers preserved and actual spend explicitly separated.
See how often AI names you.
Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.
- Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
- Who gets namedEvery competitor in the answers, most named first.
- The pages AI readsThe sources behind each answer.
- Three fixesWhat to fix first, with a brief for the first article.