6,934.3 MW

Texas ranks first

Planned facility power

20

Places ranked

of 51 tracked; the rest are below the quality bar

Oct 20

Snapshot recorded

2026

Follow changes

All 20 places by planned facility power

Texas leads at 6,934.3 MW; the middle of the board sits at 1,201.5.

Ahead of second place
2,919.3
Held by the top three
42%
Middle of the board
1,201.5
Below half the leader
18 of 20
Rank, name and planned facility powerMiddle 1,201.5
  1. 1Texas6,934.3 MW
  2. 2Wisconsin4,015 MW
  3. 3Indiana3,345 MW
  4. 4New Mexico2,723 MW
  5. 5Ohio2,662 MW
  6. 6Louisiana2,203 MW
  7. 7Tennessee2,065 MW
  8. 8Iowa1,901 MW
  9. 9Mississippi1,827 MW
  10. 10Michigan1,383 MW
  11. 11Virginia1,020 MW
  12. 12Nebraska813 MW
  13. 13North Dakota520 MW
  14. 14Alabama465 MW
  15. 15New York441 MW
  16. 16Utah411 MW
  17. 17Pennsylvania336 MW
  18. 18Wyoming249 MW
  19. 19Oklahoma181 MW
  20. 20South Carolina168 MW

planned centers: 1 on 10 of 20 rows · owners: 1 on 14 of 20 rows · 60% confidence across rows.

Planned AI data center capacity by state current rankings
RankNamePlanned facility powerStatePlanned CapExPlanned H100eWhy
01Texas6,934.3 MWTX$189.9B10.9M H100eThis rank
02Wisconsin4,015 MWWI$119.9B7.2M H100eThis rank
03Indiana3,345 MWIN$105.62B4.7M H100eThis rank
04New Mexico2,723 MWNM$74.55B6M H100eShowing
05Ohio2,662 MWOH$77.43B3.1M H100eThis rank
06Louisiana2,203 MWLA$61.82B4.1M H100eThis rank
07Tennessee2,065 MWTN$58B1.8M H100eThis rank
08Iowa1,901 MWIA$52.81B4.3M H100eThis rank
09Mississippi1,827 MWMS$57.69B1.3M H100eThis rank
10Michigan1,383 MWMI$37.43B2.9M H100eThis rank
11Virginia1,020 MWVA$26.56B667.5K H100eThis rank
12Nebraska813 MWNE$25.68B1.6M H100eThis rank
13North Dakota520 MWND$15.15B505.3K H100eThis rank
14Alabama465 MWAL$13.56B407.5K H100eThis rank
15New York441 MWNY$14.32B527.1K H100eThis rank
16Utah411 MWUT$11.52B347K H100eThis rank
17Pennsylvania336 MWPA$9.89B378K H100eThis rank
18Wyoming249 MWWY$7.84B236K H100eThis rank
19Oklahoma181 MWOK$5.8B198.1K H100eThis rank
20South Carolina168 MWSC$4.89B147K H100eThis rank

Why this rank

New Mexico on Planned AI Data Center Capacity by State

Some explanation inputs are unavailable. Not published: the evidence frozen with this snapshot.

Sums the latest future-milestone facility MW in Epoch AI by explicit source-provided U.S. state.

4

Rank on this board

2,723 MW

Score

6

Inputs behind the score

60% confidence · 1 of 1 components evidenced

What the score is built from

1 of 1 evidenced

Every component evidenced · 1 evidence record each

Components of New Mexico's score
ComponentValueContribution
Planned facility power by state MW27232,723

Unchanged since the previous snapshot

No change in rank

No component moved since the previous snapshot.

Where each number comes from

11 public records
  • Planned facility capital costPlanned capex by state 2025 · observed Oct 20, 2026, 12:00 PM UTC74,551,776,000 USD_202560% confidence
    Source
    Rank.ai Epoch planned-capacity state rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceSnapshotId":"4ae3fdf7-e727-4448-a2a0-130bef49aefa","sourceArtifactIds":["60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462"],"sourceObservationIds":["49e9f160-7cec-4808-812a-81f56adfa466","7bdfdb7a-3c3a-4e6c-b3e0-390fde2ac329","ca40db2d-ea08-4295-8f01-a24544014feb","0c6a7bee-e2f5-48d0-a467-87329de44eb4","393d1f55-eec0-4830-8255-9e7ab4a872ad","89663571-a105-4c2c-94f1-bf57b3b03008"]}
    Open the source
  • Planned AI data centersPlanned data center count by state · observed Oct 20, 2026, 12:00 PM UTC2 centers60% confidence
    Source
    Rank.ai Epoch planned-capacity state rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceSnapshotId":"4ae3fdf7-e727-4448-a2a0-130bef49aefa","sourceArtifactIds":["60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462"],"sourceObservationIds":["49e9f160-7cec-4808-812a-81f56adfa466","7bdfdb7a-3c3a-4e6c-b3e0-390fde2ac329","ca40db2d-ea08-4295-8f01-a24544014feb","0c6a7bee-e2f5-48d0-a467-87329de44eb4","393d1f55-eec0-4830-8255-9e7ab4a872ad","89663571-a105-4c2c-94f1-bf57b3b03008"]}
    Open the source
  • Planned facility powerPlanned facility power by state MW · observed Oct 20, 2026, 12:00 PM UTC2,723 MW60% confidence
    Source
    Rank.ai Epoch planned-capacity state rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceSnapshotId":"4ae3fdf7-e727-4448-a2a0-130bef49aefa","sourceArtifactIds":["60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462"],"sourceObservationIds":["49e9f160-7cec-4808-812a-81f56adfa466","7bdfdb7a-3c3a-4e6c-b3e0-390fde2ac329","ca40db2d-ea08-4295-8f01-a24544014feb","0c6a7bee-e2f5-48d0-a467-87329de44eb4","393d1f55-eec0-4830-8255-9e7ab4a872ad","89663571-a105-4c2c-94f1-bf57b3b03008"]}
    Open the source
  • Planned H100-equivalent computePlanned H100E by state · observed Oct 20, 2026, 12:00 PM UTC5,972,713.492 H100e60% confidence
    Source
    Rank.ai Epoch planned-capacity state rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceSnapshotId":"4ae3fdf7-e727-4448-a2a0-130bef49aefa","sourceArtifactIds":["60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462"],"sourceObservationIds":["49e9f160-7cec-4808-812a-81f56adfa466","7bdfdb7a-3c3a-4e6c-b3e0-390fde2ac329","ca40db2d-ea08-4295-8f01-a24544014feb","0c6a7bee-e2f5-48d0-a467-87329de44eb4","393d1f55-eec0-4830-8255-9e7ab4a872ad","89663571-a105-4c2c-94f1-bf57b3b03008"]}
    Open the source
  • Distinct disclosed ownersPlanned owner count by state · observed Oct 20, 2026, 12:00 PM UTC2 owners60% confidence
    Source
    Rank.ai Epoch planned-capacity state rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceSnapshotId":"4ae3fdf7-e727-4448-a2a0-130bef49aefa","sourceArtifactIds":["60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462","60878c5b-43c4-43ce-a756-378e51d4b462"],"sourceObservationIds":["49e9f160-7cec-4808-812a-81f56adfa466","7bdfdb7a-3c3a-4e6c-b3e0-390fde2ac329","ca40db2d-ea08-4295-8f01-a24544014feb","0c6a7bee-e2f5-48d0-a467-87329de44eb4","393d1f55-eec0-4830-8255-9e7ab4a872ad","89663571-a105-4c2c-94f1-bf57b3b03008"]}
    Open the source
  • Facility capital costSource center:data center meta los lunas:4ddff292 1afe 4b4a bd44 80bed4cef389 · observed Oct 20, 2026, 12:00 PM UTC$8.26B60% confidence
    Source
    Epoch AI open datasets
    Grade
    A
    Freshness
    fresh
    Locator
    {"rowCount":567,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-10-20","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"40bcdc602d20546fb253629beb3f25ee4df294388d5614986572e3d7ef4e1396"}
    Open the source
  • Facility powerSource center:data center meta los lunas:51019e53 717d 4904 999f 9a087d4ba102 · observed Oct 20, 2026, 12:00 PM UTC273 MW60% confidence
    Source
    Epoch AI open datasets
    Grade
    A
    Freshness
    fresh
    Locator
    {"rowCount":567,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-10-20","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"40bcdc602d20546fb253629beb3f25ee4df294388d5614986572e3d7ef4e1396"}
    Open the source
  • H100-equivalent computeSource center:data center meta los lunas:cc28ac39 cf93 4cb1 9ff6 56494c1f430e · observed Oct 20, 2026, 12:00 PM UTC869,125.821 H100e60% confidence
    Source
    Epoch AI open datasets
    Grade
    A
    Freshness
    fresh
    Locator
    {"rowCount":567,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-10-20","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"40bcdc602d20546fb253629beb3f25ee4df294388d5614986572e3d7ef4e1396"}
    Open the source
  • Facility capital costSource center:data center OpenAI stargate new mexico:4ddff292 1afe 4b4a bd44 80bed4cef389 · observed Oct 20, 2026, 12:00 PM UTC$66.29B60% confidence
    Source
    Epoch AI open datasets
    Grade
    A
    Freshness
    fresh
    Locator
    {"rowCount":567,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-10-20","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"40bcdc602d20546fb253629beb3f25ee4df294388d5614986572e3d7ef4e1396"}
    Open the source
  • Facility powerSource center:data center OpenAI stargate new mexico:51019e53 717d 4904 999f 9a087d4ba102 · observed Oct 20, 2026, 12:00 PM UTC2,450 MW60% confidence
    Source
    Epoch AI open datasets
    Grade
    A
    Freshness
    fresh
    Locator
    {"rowCount":567,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-10-20","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"40bcdc602d20546fb253629beb3f25ee4df294388d5614986572e3d7ef4e1396"}
    Open the source
  • H100-equivalent computeSource center:data center OpenAI stargate new mexico:cc28ac39 cf93 4cb1 9ff6 56494c1f430e · observed Oct 20, 2026, 12:00 PM UTC5,103,587.671 H100e60% confidence
    Source
    Epoch AI open datasets
    Grade
    A
    Freshness
    fresh
    Locator
    {"rowCount":567,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-10-20","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"40bcdc602d20546fb253629beb3f25ee4df294388d5614986572e3d7ef4e1396"}
    Open the source
Epoch AI Planned Capacity by U.S. State, version 1-epoch-us-state-name-address-v1-2026-07-27217 observations · 2 sources · quality passed
Snapshot
2e76e1a4-8ba9-4e68-b197-956759eba19e
Data hash
ccc580a087b5957a0f77065daa9db3bba9f1bd82f8b9091b552fd6abae48b1e4
Method hash
1b7dacabd00129106403c4e2ab140681e1141ef8a7f109aeaf137634a90e4503

More in Datacenters

Operating, under-construction, and planned AI capacity by place and operator.

3 boards
Operational AI data centers

Epoch AI current positive-capacity facilities ranked by estimated total facility MW, with 2025-dollar capex and calculated H100-equivalent compute beside every row.

Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.

  • Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
  • Who gets namedEvery competitor in the answers, most named first.
  • The pages AI readsThe sources behind each answer.
  • Three fixesWhat to fix first, with a brief for the first article.