RANK.AI DATA / LATEST PUBLICATION

State AI Infrastructure pipeline

6 places ranked by reviewed announced AI infrastructure projects.
Pennsylvania is out in front at 2 projects.

6 placeschecked Sep 10, 2026, 3:50 AM UTCdailyhow we measure this →CSV / JSON

Follow changes
In front today

Pennsylvania

2 projectsreviewed announced AI infrastructure projects

Ahead of second place
1
Held by the top three
57%
Middle of the board
1
Highest 2 projectsMiddle 1
1. Pennsylvania — 2 projects2. Indiana — 1 projects3. Louisiana — 1 projects4. North Carolina — 1 projects5. Wisconsin — 1 projects6. Mississippi — 1 projects
Rank 1one bar per published rowRank 6
WHY THIS RANK / VERIFIED SNAPSHOT

Mississippi

Ranks states by distinct project identities in a bounded first-party evidence universe, with verified development stage and separately scoped capacity references.

Some explanation inputs are unavailable Missing: publicFrozenEvidence.

Published rank
#6
Score
1 operators
Sample size
1

100% confidence · 65% component coverage · as of Sep 10, 2026, 3:50 AM UTC

SCORE CONSTRUCTION

Component ledger

11/17 evidenced
Components contributing to Mississippi's rank
ComponentValueWeightContributionEvidenceStatus
capacityScopesKeptSeparate1Unavailable0unavailableno_public_frozen_evidence
currentDevelopmentStageVerified1Unavailable0unavailableno_public_frozen_evidence
expansionPotentialIncludedInCapacityTotals0Unavailable0unavailableno_public_frozen_evidence
headlineAmountsSummed0Unavailable0unavailableno_public_frozen_evidence
latest reviewed infrastructure announcement date2025-11-200%01available
latest reviewed project status date2025-11-200%01available
max single disclosed infrastructure reference amount USD30000000000%01available
permitsAndGridQueuesInferred0Unavailable0unavailableno_public_frozen_evidence
projects with reviewed capacity disclosure count00%01available
reviewed AI infrastructure operator count10%01available
reviewed AI infrastructure project count1100%11available
reviewed announced project count10%01available
reviewed energized project count00%01available
reviewed permitted project count00%01available
reviewed under construction project count00%01available
reviewedProjectsUnavailable0unavailableno_public_frozen_evidence
source project:amazon warren county datacenter0%01available
WHY IT MOVED

flat since prior snapshot

0 ranks

No component moved since the prior snapshot.

PRIMARY EVIDENCE

Source trail

11 public records
  • Latest reviewed announcement datelatest reviewed infrastructure announcement date · observed Sep 10, 2026, 3:50 AM UTC2025-11-20100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"cfa77ffa-dc8e-4351-94c4-c837dca1f69a","sourceArtifactIds":["15eb3794-921d-4e1c-9ebf-9849cb21db60"],"sourceObservationIds":["2116ec1d-3c66-4053-bfb7-0049fed2f37d"]}
  • Latest reviewed project-status datelatest reviewed project status date · observed Sep 10, 2026, 3:50 AM UTC2025-11-20100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"cfa77ffa-dc8e-4351-94c4-c837dca1f69a","sourceArtifactIds":["15eb3794-921d-4e1c-9ebf-9849cb21db60"],"sourceObservationIds":["2116ec1d-3c66-4053-bfb7-0049fed2f37d"]}
  • Largest single disclosed reference amountmax single disclosed infrastructure reference amount USD · observed Sep 10, 2026, 3:50 AM UTC$3B100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"cfa77ffa-dc8e-4351-94c4-c837dca1f69a","sourceArtifactIds":["15eb3794-921d-4e1c-9ebf-9849cb21db60"],"sourceObservationIds":["2116ec1d-3c66-4053-bfb7-0049fed2f37d"]}
  • Projects with reviewed capacity disclosuresprojects with reviewed capacity disclosure count · observed Sep 10, 2026, 3:50 AM UTC0 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"cfa77ffa-dc8e-4351-94c4-c837dca1f69a","sourceArtifactIds":["15eb3794-921d-4e1c-9ebf-9849cb21db60"],"sourceObservationIds":["2116ec1d-3c66-4053-bfb7-0049fed2f37d"]}
  • Distinct operators in reviewed announcementsreviewed AI infrastructure operator count · observed Sep 10, 2026, 3:50 AM UTC1 operators100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"cfa77ffa-dc8e-4351-94c4-c837dca1f69a","sourceArtifactIds":["15eb3794-921d-4e1c-9ebf-9849cb21db60"],"sourceObservationIds":["2116ec1d-3c66-4053-bfb7-0049fed2f37d"]}
  • Reviewed announced AI infrastructure projectsreviewed AI infrastructure project count · observed Sep 10, 2026, 3:50 AM UTC1 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"cfa77ffa-dc8e-4351-94c4-c837dca1f69a","sourceArtifactIds":["15eb3794-921d-4e1c-9ebf-9849cb21db60"],"sourceObservationIds":["2116ec1d-3c66-4053-bfb7-0049fed2f37d"]}
  • Reviewed announced projectsreviewed announced project count · observed Sep 10, 2026, 3:50 AM UTC1 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"cfa77ffa-dc8e-4351-94c4-c837dca1f69a","sourceArtifactIds":["15eb3794-921d-4e1c-9ebf-9849cb21db60"],"sourceObservationIds":["2116ec1d-3c66-4053-bfb7-0049fed2f37d"]}
  • Reviewed energized projectsreviewed energized project count · observed Sep 10, 2026, 3:50 AM UTC0 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"cfa77ffa-dc8e-4351-94c4-c837dca1f69a","sourceArtifactIds":["15eb3794-921d-4e1c-9ebf-9849cb21db60"],"sourceObservationIds":["2116ec1d-3c66-4053-bfb7-0049fed2f37d"]}
  • Reviewed permitted projectsreviewed permitted project count · observed Sep 10, 2026, 3:50 AM UTC0 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"cfa77ffa-dc8e-4351-94c4-c837dca1f69a","sourceArtifactIds":["15eb3794-921d-4e1c-9ebf-9849cb21db60"],"sourceObservationIds":["2116ec1d-3c66-4053-bfb7-0049fed2f37d"]}
  • Reviewed projects under constructionreviewed under construction project count · observed Sep 10, 2026, 3:50 AM UTC0 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"cfa77ffa-dc8e-4351-94c4-c837dca1f69a","sourceArtifactIds":["15eb3794-921d-4e1c-9ebf-9849cb21db60"],"sourceObservationIds":["2116ec1d-3c66-4053-bfb7-0049fed2f37d"]}
  • Disclosed infrastructure investment reference amountsource project:amazon warren county datacenter · observed Sep 10, 2026, 3:50 AM UTC$3B100% confidence
    Source
    Official Company AI Infrastructure Disclosures
    Grade
    A
    Freshness
    fresh
    Locator
    {"canonicalUrl":"https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment","anchorsVerified":true,"contentHashKind":"sha256_evidence_bundle","statusSourceUrl":"https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment","sourceTextStored":false,"statusContentHash":"e185a81786aba5be23c00f123d41e1ad4fbb6b36f62c7c74452faf1f9223bfd9","primaryContentHash":"e185a81786aba5be23c00f123d41e1ad4fbb6b36f62c7c74452faf1f9223bfd9","requiredFactAnchors":["3 billion","warren county"],"statusAnchorsVerified":true,"statusRequiredFactAnchors":["plans to invest","new data center campus"]}
    Open primary evidence ↗
REPRODUCIBILITYState AI Infrastructure Pipeline · v1-us-state-v2-2026-07-27-2026-07-27-v270 observations · 2 sources · passed quality
Snapshot
c9a2110a-9852-4219-a0dd-d42b0185835b
Data hash
879a7bcad430693f9b27ce451de6da6cb2e62cb32bf4a1794af5988225dd0dae
Method hash
d1e838d7cf03c77567d842e067466a2b1b2992b1521db50619edf0991e07cb61

More in Datacenters

Operating, under-construction, and planned AI capacity by place and operator.

3 live tables
Operational AI data centers

Epoch AI current positive-capacity facilities ranked by estimated total facility MW, with 2025-dollar capex and calculated H100-equivalent compute beside every row.

Planned AI data center capacity

Latest future-dated Epoch AI capacity milestone per facility, with planned MW, 2025-dollar capex, H100e, construction status, evidence, and uncertainty preserved.