EPA eGRID generation-based annual state CO2e output rates with nameplate capacity, net generation, and coal, gas, nuclear, and renewable mix. Not consumption-based, marginal, or data-center-specific.
State power economics
51 places ranked by industrial retail electricity price.
New Mexico is out in front at 4.62¢/kWh.
51 placeschecked Jun 30, 2026, 11:59 PM UTCdailyhow we measure this →CSV / JSON
New Mexico
4.62¢/kWhindustrial retail electricity price
- Dearest published row
- 43.37¢/kWh
- Middle of the board
- 9.3
Georgia
Ranks states by the latest complete common month of EIA statewide industrial retail electricity prices.
Some explanation inputs are unavailable Missing: publicFrozenEvidence, comparablePriorRanking.
- Published rank
- #21
- Score
- 8.86 cents_per_kilowatthour
- Sample size
- 3
100% confidence · 38% component coverage · as of Jun 30, 2026, 11:59 PM UTC
Component ledger
| Component | Value | Weight | Contribution | Evidence | Status |
|---|---|---|---|---|---|
| commercialPrice | 11.9100000000 | 0% | — | 0 | unavailableno_public_frozen_evidence |
| eia commercial minus industrial price cents kwh | — | 0% | 0 | 1 | available |
| eia commercial retail price cents kwh | — | 0% | 0 | 1 | available |
| eia industrial retail price cents kwh | — | 100% | 8.86 | 1 | available |
| industrialPrice | 8.8600000000 | 100% | — | 0 | unavailableno_public_frozen_evidence |
| notDataCenterSpecific | 1 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| priceSpread | 3.0500000000 | 0% | — | 0 | unavailableno_public_frozen_evidence |
| stateCode | GA | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
down since prior snapshot
component_history_unavailable
No component moved since the prior snapshot.
Source trail
Commercial minus industrial price spreadeia commercial minus industrial price cents kwh · observed Jun 30, 2026, 11:59 PM UTC3.05 cents_per_kilowatthour100% confidence
- Source
- U.S. EIA Electric Power Monthly table 5.6.A
- Grade
- A
- Freshness
- fresh
- Locator
{"table":"5.6.A","period":"2026-06","workbook":"table_5_06_a.xlsx","worksheet":"sheet1","stateColumn":"A","commercialColumn":"D","industrialColumn":"F"}
Commercial retail electricity priceeia commercial retail price cents kwh · observed Jun 30, 2026, 11:59 PM UTC11.91 cents_per_kilowatthour100% confidence
- Source
- U.S. EIA Electric Power Monthly table 5.6.A
- Grade
- A
- Freshness
- fresh
- Locator
{"table":"5.6.A","period":"2026-06","workbook":"table_5_06_a.xlsx","worksheet":"sheet1","stateColumn":"A","commercialColumn":"D","industrialColumn":"F"}
Industrial retail electricity priceeia industrial retail price cents kwh · observed Jun 30, 2026, 11:59 PM UTC8.86 cents_per_kilowatthour100% confidence
- Source
- U.S. EIA Electric Power Monthly table 5.6.A
- Grade
- A
- Freshness
- fresh
- Locator
{"table":"5.6.A","period":"2026-06","workbook":"table_5_06_a.xlsx","worksheet":"sheet1","stateColumn":"A","commercialColumn":"D","industrialColumn":"F"}
Free to reference with attribution. Copy a ready-made citation, or link to this page directly. The underlying table updates in place.
- Plain text
State Power Economics. Rank.ai, data as of June 30, 2026. https://www.rank.ai/rankings/power/state-power-economics - HTML
<a href="https://www.rank.ai/rankings/power/state-power-economics">State Power Economics</a> — Rank.ai, data as of June 30, 2026 - Markdown
[State Power Economics](https://www.rank.ai/rankings/power/state-power-economics) — Rank.ai, data as of June 30, 2026 - APA
Rank.ai. (2026). State Power Economics. Retrieved September 10, 2026, from https://www.rank.ai/rankings/power/state-power-economics
<iframe src="https://www.rank.ai/embed/boards/state-power-economics" title="State Power Economics" width="100%" height="420" loading="lazy" style="border:1px solid #111;max-width:720px"></iframe>
<p style="font-size:12px">Source: <a href="https://www.rank.ai/rankings/power/state-power-economics">State Power Economics</a> by Rank.ai</p>More in Power
Utility load, generation queues, power agreements, and grid constraints.
Signed, contracted, and prospective datacenter load by utility territory.
Planned load compared with generation and transmission additions.
See how your brand ranks in AI answers.
The same measurement behind this board, run on your own domain — free, by email, in about a minute.