Skip to content

US state

Wyoming

Data centers, planned capacity, power prices, grid emissions and the AI workforce, each tied to a published source and method.
Latest evidence Oct 25, 2026 · 3 datasets

249 MW

Planned capacity

#18 among published states

8.80¢

Industrial power

per kWh · EIA

1.8K

Grid carbon intensity

lb CO₂e per MWh · eGRID

Planned AI capacity

#18

Announced and permitted capacity separated by development stage and confidence.

Published value
249 MW
Observations
3
Confidence
60%
As of
Oct 20, 2026

Industrial electricity prices

#20

Statewide average retail electricity prices for commercial and industrial customers, from EIA.

Published value
8.80¢/kWh
Observations
3
Confidence
100%
As of
Aug 31, 2026

Grid carbon intensity

#50

EPA eGRID generation-based annual state CO2e output rates with nameplate capacity, net generation, and coal, gas, nuclear, and renewable mix. Not consumption-based, marginal, or data-center-specific.

Published value
1,833.263 lb CO₂e per MWh
Observations
7
Confidence
100%
As of
Dec 31, 2023

Projects

Planned AI data centers

ProjectOwnerPlanned MW2025 capex estimateMilestoneEvidence
Meta CheyenneCheyenne, WY 82007, USAMeta249 MW$7.8BFeb 15, 202760% confidence
Evidence note

Buildings 3 and 4 are similar in style and size to the ones seen at the Prometheus site, we estimate their operability based on that timeline.

Planned capacity is an estimate from reviewed announcements, not metered utility load. Planned does not mean permitted, financed, built or energized.

Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.

  • Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
  • Who gets namedEvery competitor in the answers, most named first.
  • The pages AI readsThe sources behind each answer.
  • Three fixesWhat to fix first, with a brief for the first article.