US state
Wyoming
249 MW
Planned capacity
#18 among published states
8.80¢
Industrial power
per kWh · EIA
1.8K
Grid carbon intensity
lb CO₂e per MWh · eGRID
Planned AI capacity
#18Announced and permitted capacity separated by development stage and confidence.
- Published value
- 249 MW
- Observations
- 3
- Confidence
- 60%
- As of
- Oct 20, 2026
Industrial electricity prices
#20Statewide average retail electricity prices for commercial and industrial customers, from EIA.
- Published value
- 8.80¢/kWh
- Observations
- 3
- Confidence
- 100%
- As of
- Aug 31, 2026
Grid carbon intensity
#50EPA eGRID generation-based annual state CO2e output rates with nameplate capacity, net generation, and coal, gas, nuclear, and renewable mix. Not consumption-based, marginal, or data-center-specific.
- Published value
- 1,833.263 lb CO₂e per MWh
- Observations
- 7
- Confidence
- 100%
- As of
- Dec 31, 2023
Projects
Planned AI data centers
| Project | Owner | Planned MW | 2025 capex estimate | Milestone | Evidence |
|---|---|---|---|---|---|
| Meta CheyenneCheyenne, WY 82007, USA | Meta | 249 MW | $7.8B | Feb 15, 2027 | 60% confidenceEvidence noteBuildings 3 and 4 are similar in style and size to the ones seen at the Prometheus site, we estimate their operability based on that timeline. |
Planned capacity is an estimate from reviewed announcements, not metered utility load. Planned does not mean permitted, financed, built or energized.
See how often AI names you.
Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.
- Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
- Who gets namedEvery competitor in the answers, most named first.
- The pages AI readsThe sources behind each answer.
- Three fixesWhat to fix first, with a brief for the first article.