Virginia
Data centers, planned capacity, power economics, grid emissions, and AI workforce signals—each tied to a published source and methodology.
- Datasets
- 4
- Latest evidence
- Sep 11, 2026
- Coverage
- Project-level
Planned AI capacity
Latest future-milestone AI data-center facility MW in Epoch AI aggregated by explicit source-provided U.S. state, with facility count, estimated capex, H100e, and owner breadth.
- Published value
- 1,020 MW
- Evidence N
- 9
- Confidence
- 60%
- As of
- Sep 10, 2026
Industrial electricity economics
Monthly statewide commercial and industrial retail electricity prices for all 50 states and the District of Columbia.
- Published value
- 9.31¢/kWh
- Evidence N
- 3
- Confidence
- 100%
- As of
- Jun 30, 2026
Grid carbon intensity
Generation-based state power-sector CO2e intensity with capacity, generation, and resource-mix context for all 50 states and DC.
- Published value
- 539.599 pounds_per_megawatt_hour
- Evidence N
- 7
- Confidence
- 100%
- As of
- Dec 31, 2023
AI workforce
State employment, concentration, and pay for the exact BLS SOC 15-2051 Data Scientists occupation.
- Published value
- 8,920 jobs
- Evidence N
- 5
- Confidence
- 100%
- As of
- May 15, 2026
Planned AI data centers
| Project | Owner | Planned MW | 2025 CapEx estimate | Milestone | Evidence status |
|---|---|---|---|---|---|
| CoreWeave Chester VA1401 Meadowville Technology Parkway, Chester, VA | CoreWeave | 197 MW | $4.3B | Jun 30, 2027 | 60% confidenceEvidence noteBuildings 3 is estimated complete by the end of Q1 2027, based on the current PowerHouse schedule. Added another three months to account for commissioning and server installation. |
| QTS Richmond 33525–3543 Portugee Rd, Sandston, VA 23150 | Undisclosed | 336 MW | $9.1B | Feb 13, 2027 | 60% confidenceEvidence noteBuilding 4 and 5 are operational, based on Building 5 being roughly 1 year behind Building 1 in satellite imagery. |
| STACK Infrastructure NVA029590 Hornbaker Rd, Manassas, VA 20109 | Undisclosed | 487 MW | $13.2B | Jan 1, 2028 | 60% confidenceEvidence noteEstimate: All 6 AI data center buildings will be finished in 2028, assuming a groundbreak-to-operational timeline of 18-24 months. One is complete, three are clearly under construction, and the last two data centers are still breaking ground and laying foundations. |
Planned capacity is estimated, not metered utility load. Planned does not mean permitted, financed, constructed, or energized. Open each project and methodology before using these figures.