US state
Virginia
1K MW
Planned capacity
#11 among published states
9.98¢
Industrial power
per kWh · EIA
539.6
Grid carbon intensity
lb CO₂e per MWh · eGRID
8.9K
Data scientists
state employment · BLS
Planned AI capacity
#11Announced and permitted capacity separated by development stage and confidence.
- Published value
- 1,020 MW
- Observations
- 9
- Confidence
- 60%
- As of
- Oct 20, 2026
Industrial electricity prices
#31Statewide average retail electricity prices for commercial and industrial customers, from EIA.
- Published value
- 9.98¢/kWh
- Observations
- 3
- Confidence
- 100%
- As of
- Aug 31, 2026
Grid carbon intensity
#14EPA eGRID generation-based annual state CO2e output rates with nameplate capacity, net generation, and coal, gas, nuclear, and renewable mix. Not consumption-based, marginal, or data-center-specific.
- Published value
- 539.599 lb CO₂e per MWh
- Observations
- 7
- Confidence
- 100%
- As of
- Dec 31, 2023
AI workforce
#11Exact BLS SOC 15-2051 state employment ranked with concentration, annual pay, survey error, and suppression status preserved.
- Published value
- 8,920 jobs
- Observations
- 5
- Confidence
- 100%
- As of
- May 15, 2026
Projects
Planned AI data centers
| Project | Owner | Planned MW | 2025 capex estimate | Milestone | Evidence |
|---|---|---|---|---|---|
| CoreWeave Chester VA1401 Meadowville Technology Parkway, Chester, VA | CoreWeave | 197 MW | $4.3B | Jun 30, 2027 | 60% confidenceEvidence noteBuildings 3 is estimated complete by the end of Q1 2027, based on the current PowerHouse schedule. Added another three months to account for commissioning and server installation. |
| QTS Richmond 33525–3543 Portugee Rd, Sandston, VA 23150 | Undisclosed | 336 MW | $9.1B | Feb 13, 2027 | 60% confidenceEvidence noteBuilding 4 and 5 are operational, based on Building 5 being roughly 1 year behind Building 1 in satellite imagery. |
| STACK Infrastructure NVA029590 Hornbaker Rd, Manassas, VA 20109 | Undisclosed | 487 MW | $13.2B | Jan 1, 2028 | 60% confidenceEvidence noteEstimate: All 6 AI data center buildings will be finished in 2028, assuming a groundbreak-to-operational timeline of 18-24 months. One is complete, three are clearly under construction, and the last two data centers are still breaking ground and laying foundations. |
Planned capacity is an estimate from reviewed announcements, not metered utility load. Planned does not mean permitted, financed, built or energized.
See how often AI names you.
Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.
- Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
- Who gets namedEvery competitor in the answers, most named first.
- The pages AI readsThe sources behind each answer.
- Three fixesWhat to fix first, with a brief for the first article.