Nebraska

Data centers, planned capacity, power economics, grid emissions, and AI workforce signals—each tied to a published source and methodology.

Datasets
4
Latest evidence
Sep 11, 2026
Coverage
Project-level
Planned capacity813 MW#12 among published states
Planned centers21 named owners
Industrial power9.64¢per kWh · EIA
Grid carbon intensity1Klb CO₂e / MWh · eGRID
Data scientists2Kstate employment · BLS
RANK.AI DATA

Planned AI capacity

#12

Latest future-milestone AI data-center facility MW in Epoch AI aggregated by explicit source-provided U.S. state, with facility count, estimated capex, H100e, and owner breadth.

Published value
813 MW
Evidence N
6
Confidence
60%
As of
Sep 10, 2026
RANK.AI DATA

Industrial electricity economics

#28

Monthly statewide commercial and industrial retail electricity prices for all 50 states and the District of Columbia.

Published value
9.64¢/kWh
Evidence N
3
Confidence
100%
As of
Jun 30, 2026
RANK.AI DATA

Grid carbon intensity

#39

Generation-based state power-sector CO2e intensity with capacity, generation, and resource-mix context for all 50 states and DC.

Published value
1,025.822 pounds_per_megawatt_hour
Evidence N
7
Confidence
100%
As of
Dec 31, 2023
RANK.AI DATA

AI workforce

#28

State employment, concentration, and pay for the exact BLS SOC 15-2051 Data Scientists occupation.

Published value
1,980 jobs
Evidence N
5
Confidence
100%
As of
May 15, 2026
Project-level evidence

Planned AI data centers

Compare all states →

ProjectOwnerPlanned MW2025 CapEx estimateMilestoneEvidence status
Google Lincoln5475 Cloud Ct, Lincoln, NE 68514Google339 MW$10.7BOct 1, 202760% confidence
Evidence note

Building 2 operational. Estimated based on the construction timeline for Building 1, specifically the time to operational since the roof was complete and the time to operational since the foundation work began.

Google Omaha11110 State St, Omaha, NE 68142Google474 MW$15BJul 23, 202860% confidence
Evidence note

Building 5 is operational. We expect a 5th building because there's enough land cleared for one. We assume a roughly 6-month delay after Building 4.

Planned capacity is estimated, not metered utility load. Planned does not mean permitted, financed, constructed, or energized. Open each project and methodology before using these figures.