US state

Mississippi

Data centers, planned capacity, power prices, grid emissions and the AI workforce, each tied to a published source and method.
Latest evidence Oct 25, 2026 · 4 datasets

1.8K MW

Planned capacity

#9 among published states

7.57¢

Industrial power

per kWh · EIA

828.3

Grid carbon intensity

lb CO₂e per MWh · eGRID

440

Data scientists

state employment · BLS

Planned AI capacity

#9

Announced and permitted capacity separated by development stage and confidence.

Published value
1,827 MW
Observations
6
Confidence
60%
As of
Oct 20, 2026

Industrial electricity prices

#7

Statewide average retail electricity prices for commercial and industrial customers, from EIA.

Published value
7.57¢/kWh
Observations
3
Confidence
100%
As of
Aug 31, 2026

Grid carbon intensity

#35

EPA eGRID generation-based annual state CO2e output rates with nameplate capacity, net generation, and coal, gas, nuclear, and renewable mix. Not consumption-based, marginal, or data-center-specific.

Published value
828.274 lb CO₂e per MWh
Observations
7
Confidence
100%
As of
Dec 31, 2023

AI workforce

#43

Exact BLS SOC 15-2051 state employment ranked with concentration, annual pay, survey error, and suppression status preserved.

Published value
440 jobs
Observations
5
Confidence
100%
As of
May 15, 2026

Projects

Planned AI data centers

ProjectOwnerPlanned MW2025 capex estimateMilestoneEvidence
Amazon Madison Mega SiteAmazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison CountyAmazon819 MW$25.9BMar 15, 202860% confidence
Evidence note

Buildings 8-12 are operational. In June of 2026 only a faint outline of buildings 10,11 and 12 is visible, estimating construction completion to be the end of 2027, alligning with [expected completion by 2027](https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/). This final estimates adds three months to that for server installation.

Amazon Ridgeland1626 County Line Road Ridgeland, MississippiAmazon1K MW$31.8BSep 29, 202860% confidence
Evidence note

Buildings 6-14 are operational (estimate). Buildings 1-4 took an estimated 2.25 years on this site. We assume Buildings 6-14 get underway by July 2026, and take the same time as Buildings 1-4. This is later than the [expected completion by 2027](https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/).

Planned capacity is an estimate from reviewed announcements, not metered utility load. Planned does not mean permitted, financed, built or energized.

Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.

  • Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
  • Who gets namedEvery competitor in the answers, most named first.
  • The pages AI readsThe sources behind each answer.
  • Three fixesWhat to fix first, with a brief for the first article.