State AI economy · published evidence

Mississippi

Data centers, planned capacity, power economics, grid emissions, and AI workforce signals—each tied to a published source and methodology.

Datasets
4
Latest evidence
Sep 11, 2026
Coverage
Project-level
Planned capacity1.8K MW#9 among published states
Planned centers21 named owners
Industrial power8.29¢per kWh · EIA
Grid carbon intensity828.3lb CO₂e / MWh · eGRID
Data scientists440state employment · BLS
RANK.AI DATA

Planned AI capacity

#9

Latest future-milestone AI data-center facility MW in Epoch AI aggregated by explicit source-provided U.S. state, with facility count, estimated capex, H100e, and owner breadth.

Published value
1,827 MW
Evidence N
6
Confidence
60%
As of
Sep 10, 2026
RANK.AI DATA

Industrial electricity economics

#16

Monthly statewide commercial and industrial retail electricity prices for all 50 states and the District of Columbia.

Published value
8.29¢/kWh
Evidence N
3
Confidence
100%
As of
Jun 30, 2026
RANK.AI DATA

Grid carbon intensity

#35

Generation-based state power-sector CO2e intensity with capacity, generation, and resource-mix context for all 50 states and DC.

Published value
828.274 pounds_per_megawatt_hour
Evidence N
7
Confidence
100%
As of
Dec 31, 2023
RANK.AI DATA

AI workforce

#43

State employment, concentration, and pay for the exact BLS SOC 15-2051 Data Scientists occupation.

Published value
440 jobs
Evidence N
5
Confidence
100%
As of
May 15, 2026
Project-level evidence

Planned AI data centers

Compare all states →

ProjectOwnerPlanned MW2025 CapEx estimateMilestoneEvidence status
Amazon Madison Mega SiteAmazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison CountyAmazon819 MW$25.9BMar 15, 202860% confidence
Evidence note

Buildings 8-12 are operational. In June of 2026 only a faint outline of buildings 10,11 and 12 is visible, estimating construction completion to be the end of 2027, alligning with [expected completion by 2027](https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/). This final estimates adds three months to that for server installation.

Amazon Ridgeland1626 County Line Road Ridgeland, MississippiAmazon1K MW$31.8BSep 29, 202860% confidence
Evidence note

Buildings 6-14 are operational (estimate). Buildings 1-4 took an estimated 2.25 years on this site. We assume Buildings 6-14 get underway by July 2026, and take the same time as Buildings 1-4. This is later than the [expected completion by 2027](https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/).

Planned capacity is estimated, not metered utility load. Planned does not mean permitted, financed, constructed, or energized. Open each project and methodology before using these figures.