US state
Mississippi
1.8K MW
Planned capacity
#9 among published states
7.57¢
Industrial power
per kWh · EIA
828.3
Grid carbon intensity
lb CO₂e per MWh · eGRID
440
Data scientists
state employment · BLS
Planned AI capacity
#9Announced and permitted capacity separated by development stage and confidence.
- Published value
- 1,827 MW
- Observations
- 6
- Confidence
- 60%
- As of
- Oct 20, 2026
Industrial electricity prices
#7Statewide average retail electricity prices for commercial and industrial customers, from EIA.
- Published value
- 7.57¢/kWh
- Observations
- 3
- Confidence
- 100%
- As of
- Aug 31, 2026
Grid carbon intensity
#35EPA eGRID generation-based annual state CO2e output rates with nameplate capacity, net generation, and coal, gas, nuclear, and renewable mix. Not consumption-based, marginal, or data-center-specific.
- Published value
- 828.274 lb CO₂e per MWh
- Observations
- 7
- Confidence
- 100%
- As of
- Dec 31, 2023
AI workforce
#43Exact BLS SOC 15-2051 state employment ranked with concentration, annual pay, survey error, and suppression status preserved.
- Published value
- 440 jobs
- Observations
- 5
- Confidence
- 100%
- As of
- May 15, 2026
Projects
Planned AI data centers
| Project | Owner | Planned MW | 2025 capex estimate | Milestone | Evidence |
|---|---|---|---|---|---|
| Amazon Madison Mega SiteAmazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County | Amazon | 819 MW | $25.9B | Mar 15, 2028 | 60% confidenceEvidence noteBuildings 8-12 are operational. In June of 2026 only a faint outline of buildings 10,11 and 12 is visible, estimating construction completion to be the end of 2027, alligning with [expected completion by 2027](https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/). This final estimates adds three months to that for server installation. |
| Amazon Ridgeland1626 County Line Road Ridgeland, Mississippi | Amazon | 1K MW | $31.8B | Sep 29, 2028 | 60% confidenceEvidence noteBuildings 6-14 are operational (estimate). Buildings 1-4 took an estimated 2.25 years on this site. We assume Buildings 6-14 get underway by July 2026, and take the same time as Buildings 1-4. This is later than the [expected completion by 2027](https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/). |
Planned capacity is an estimate from reviewed announcements, not metered utility load. Planned does not mean permitted, financed, built or energized.
See how often AI names you.
Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.
- Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
- Who gets namedEvery competitor in the answers, most named first.
- The pages AI readsThe sources behind each answer.
- Three fixesWhat to fix first, with a brief for the first article.