US state

Louisiana

Data centers, planned capacity, power prices, grid emissions and the AI workforce, each tied to a published source and method.
Latest evidence Oct 25, 2026 · 4 datasets

2.2K MW

Planned capacity

#6 among published states

6.10¢

Industrial power

per kWh · EIA

763.1

Grid carbon intensity

lb CO₂e per MWh · eGRID

1.3K

Data scientists

state employment · BLS

Planned AI capacity

#6

Announced and permitted capacity separated by development stage and confidence.

Published value
2,203 MW
Observations
3
Confidence
60%
As of
Oct 20, 2026

Industrial electricity prices

#2

Statewide average retail electricity prices for commercial and industrial customers, from EIA.

Published value
6.10¢/kWh
Observations
3
Confidence
100%
As of
Aug 31, 2026

Grid carbon intensity

#29

EPA eGRID generation-based annual state CO2e output rates with nameplate capacity, net generation, and coal, gas, nuclear, and renewable mix. Not consumption-based, marginal, or data-center-specific.

Published value
763.068 lb CO₂e per MWh
Observations
7
Confidence
100%
As of
Dec 31, 2023

AI workforce

#35

Exact BLS SOC 15-2051 state employment ranked with concentration, annual pay, survey error, and suppression status preserved.

Published value
1,300 jobs
Observations
5
Confidence
100%
As of
May 15, 2026

Projects

Planned AI data centers

ProjectOwnerPlanned MW2025 capex estimateMilestoneEvidence
Meta HyperionHolly Ridge, LA 71269Meta2.2K MW$61.8BJan 1, 202860% confidence
Evidence note

First phase is operational, based on a [Meta blog post](https://drive.google.com/file/d/1PmFNgOwkPepwjpGIbNUuPJP0LNgIqe7l/view?usp=sharing). We assume that this aligns with the three natural gas turbines being completed, for a total of 2262 MW capacity, but that these turbines have a backup role. This is close to the 1800 MW of load requested from the grid. Meta [claims](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/) that "The Hyperion cluster will have a 5-gigawatt capacity once complete", but so far there is no concrete evidence for this happening at the Holly Ridge site alone.

Planned capacity is an estimate from reviewed announcements, not metered utility load. Planned does not mean permitted, financed, built or energized.

Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.

  • Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
  • Who gets namedEvery competitor in the answers, most named first.
  • The pages AI readsThe sources behind each answer.
  • Three fixesWhat to fix first, with a brief for the first article.