US state
Indiana
3.3K MW
Planned capacity
#3 among published states
9.28¢
Industrial power
per kWh · EIA
1.5K
Grid carbon intensity
lb CO₂e per MWh · eGRID
3.6K
Data scientists
state employment · BLS
Planned AI capacity
#3Announced and permitted capacity separated by development stage and confidence.
- Published value
- 3,345 MW
- Observations
- 6
- Confidence
- 60%
- As of
- Oct 20, 2026
Industrial electricity prices
#23Statewide average retail electricity prices for commercial and industrial customers, from EIA.
- Published value
- 9.28¢/kWh
- Observations
- 3
- Confidence
- 100%
- As of
- Aug 31, 2026
Grid carbon intensity
#48EPA eGRID generation-based annual state CO2e output rates with nameplate capacity, net generation, and coal, gas, nuclear, and renewable mix. Not consumption-based, marginal, or data-center-specific.
- Published value
- 1,465.502 lb CO₂e per MWh
- Observations
- 7
- Confidence
- 100%
- As of
- Dec 31, 2023
AI workforce
#22Exact BLS SOC 15-2051 state employment ranked with concentration, annual pay, survey error, and suppression status preserved.
- Published value
- 3,580 jobs
- Observations
- 5
- Confidence
- 100%
- As of
- May 15, 2026
Projects
Planned AI data centers
| Project | Owner | Planned MW | 2025 capex estimate | Milestone | Evidence |
|---|---|---|---|---|---|
| Anthropic-Amazon New Carlisle55001 Larrison Blvd, New Carlisle, IN 46552 | Amazon | 2.3K MW | $72.9B | Mar 17, 2028 | 60% confidenceEvidence noteBuildings 19-32 are operational. This is an estimate based on how long Buildings 1-16 took to become operational. In May 2026, the foundation of several buildings and a substation was visible at the site of Buildings 19-32. Buildings 1-16 took 1 year and 10 months to go from a similar state to operational. So we add 1 year and 10 months to May 2026 to get this date estimate. The power capacity is based on an [air quality permit](https://t.co/HsAO7oyKa2) filed in May 2026, and the compute capacity is based on Trainium3 chips. |
| Google Fort Wayne6015 Adams Center Road, Fort Wayne, IN 46806 | 1K MW | $32.7B | Jun 23, 2028 | 60% confidenceEvidence noteEstimated operational date of Building 6. Based on previous buildings being separated by about 5 months. |
Planned capacity is an estimate from reviewed announcements, not metered utility load. Planned does not mean permitted, financed, built or energized.
See how often AI names you.
Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.
- Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
- Who gets namedEvery competitor in the answers, most named first.
- The pages AI readsThe sources behind each answer.
- Three fixesWhat to fix first, with a brief for the first article.