State AI economy · published evidence

Indiana

Data centers, planned capacity, power economics, grid emissions, and AI workforce signals—each tied to a published source and methodology.

Datasets
4
Latest evidence
Sep 12, 2026
Coverage
Project-level
Planned capacity3.3K MW#3 among published states
Planned centers22 named owners
Industrial power9.00¢per kWh · EIA
Grid carbon intensity1.5Klb CO₂e / MWh · eGRID
Data scientists3.6Kstate employment · BLS
RANK.AI DATA

Planned AI capacity

#3

Latest future-milestone AI data-center facility MW in Epoch AI aggregated by explicit source-provided U.S. state, with facility count, estimated capex, H100e, and owner breadth.

Published value
3,345 MW
Evidence N
6
Confidence
60%
As of
Sep 11, 2026
RANK.AI DATA

Industrial electricity economics

#22

Monthly statewide commercial and industrial retail electricity prices for all 50 states and the District of Columbia.

Published value
9.00¢/kWh
Evidence N
3
Confidence
100%
As of
Jun 30, 2026
RANK.AI DATA

Grid carbon intensity

#48

Generation-based state power-sector CO2e intensity with capacity, generation, and resource-mix context for all 50 states and DC.

Published value
1,465.502 pounds_per_megawatt_hour
Evidence N
7
Confidence
100%
As of
Dec 31, 2023
RANK.AI DATA

AI workforce

#22

State employment, concentration, and pay for the exact BLS SOC 15-2051 Data Scientists occupation.

Published value
3,580 jobs
Evidence N
5
Confidence
100%
As of
May 15, 2026
Project-level evidence

Planned AI data centers

Compare all states →

ProjectOwnerPlanned MW2025 CapEx estimateMilestoneEvidence status
Anthropic-Amazon New Carlisle55001 Larrison Blvd, New Carlisle, IN 46552Amazon2.3K MW$72.9BMar 17, 202860% confidence
Evidence note

Buildings 19-32 are operational. This is an estimate based on how long Buildings 1-16 took to become operational. In May 2026, the foundation of several buildings and a substation was visible at the site of Buildings 19-32. Buildings 1-16 took 1 year and 10 months to go from a similar state to operational. So we add 1 year and 10 months to May 2026 to get this date estimate. The power capacity is based on an [air quality permit](https://t.co/HsAO7oyKa2) filed in May 2026, and the compute capacity is based on Trainium3 chips.

Google Fort Wayne6015 Adams Center Road, Fort Wayne, IN 46806Google1K MW$32.7BJun 23, 202860% confidence
Evidence note

Estimated operational date of Building 6. Based on previous buildings being separated by about 5 months.

Planned capacity is estimated, not metered utility load. Planned does not mean permitted, financed, constructed, or energized. Open each project and methodology before using these figures.