Indiana

Data centers, planned capacity, power prices, grid emissions and the AI workforce, each tied to a published source and method.
Latest evidence Oct 25, 2026 · 4 datasets

3.3K MW

Planned capacity

#3 among published states

9.28¢

Industrial power

per kWh · EIA

1.5K

Grid carbon intensity

lb CO₂e per MWh · eGRID

3.6K

Data scientists

state employment · BLS

Planned AI capacity

#3

Announced and permitted capacity separated by development stage and confidence.

Published value
3,345 MW
Observations
6
Confidence
60%
As of
Oct 20, 2026

Industrial electricity prices

#23

Statewide average retail electricity prices for commercial and industrial customers, from EIA.

Published value
9.28¢/kWh
Observations
3
Confidence
100%
As of
Aug 31, 2026

Grid carbon intensity

#48

EPA eGRID generation-based annual state CO2e output rates with nameplate capacity, net generation, and coal, gas, nuclear, and renewable mix. Not consumption-based, marginal, or data-center-specific.

Published value
1,465.502 lb CO₂e per MWh
Observations
7
Confidence
100%
As of
Dec 31, 2023

AI workforce

#22

Exact BLS SOC 15-2051 state employment ranked with concentration, annual pay, survey error, and suppression status preserved.

Published value
3,580 jobs
Observations
5
Confidence
100%
As of
May 15, 2026

Projects

Planned AI data centers

ProjectOwnerPlanned MW2025 capex estimateMilestoneEvidence
Anthropic-Amazon New Carlisle55001 Larrison Blvd, New Carlisle, IN 46552Amazon2.3K MW$72.9BMar 17, 202860% confidence
Evidence note

Buildings 19-32 are operational. This is an estimate based on how long Buildings 1-16 took to become operational. In May 2026, the foundation of several buildings and a substation was visible at the site of Buildings 19-32. Buildings 1-16 took 1 year and 10 months to go from a similar state to operational. So we add 1 year and 10 months to May 2026 to get this date estimate. The power capacity is based on an [air quality permit](https://t.co/HsAO7oyKa2) filed in May 2026, and the compute capacity is based on Trainium3 chips.

Google Fort Wayne6015 Adams Center Road, Fort Wayne, IN 46806Google1K MW$32.7BJun 23, 202860% confidence
Evidence note

Estimated operational date of Building 6. Based on previous buildings being separated by about 5 months.

Planned capacity is an estimate from reviewed announcements, not metered utility load. Planned does not mean permitted, financed, built or energized.

Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.

  • Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
  • Who gets namedEvery competitor in the answers, most named first.
  • The pages AI readsThe sources behind each answer.
  • Three fixesWhat to fix first, with a brief for the first article.