Indiana
Data centers, planned capacity, power economics, grid emissions, and AI workforce signals—each tied to a published source and methodology.
- Datasets
- 4
- Latest evidence
- Sep 12, 2026
- Coverage
- Project-level
Planned AI capacity
Latest future-milestone AI data-center facility MW in Epoch AI aggregated by explicit source-provided U.S. state, with facility count, estimated capex, H100e, and owner breadth.
- Published value
- 3,345 MW
- Evidence N
- 6
- Confidence
- 60%
- As of
- Sep 11, 2026
Industrial electricity economics
Monthly statewide commercial and industrial retail electricity prices for all 50 states and the District of Columbia.
- Published value
- 9.00¢/kWh
- Evidence N
- 3
- Confidence
- 100%
- As of
- Jun 30, 2026
Grid carbon intensity
Generation-based state power-sector CO2e intensity with capacity, generation, and resource-mix context for all 50 states and DC.
- Published value
- 1,465.502 pounds_per_megawatt_hour
- Evidence N
- 7
- Confidence
- 100%
- As of
- Dec 31, 2023
AI workforce
State employment, concentration, and pay for the exact BLS SOC 15-2051 Data Scientists occupation.
- Published value
- 3,580 jobs
- Evidence N
- 5
- Confidence
- 100%
- As of
- May 15, 2026
Planned AI data centers
| Project | Owner | Planned MW | 2025 CapEx estimate | Milestone | Evidence status |
|---|---|---|---|---|---|
| Anthropic-Amazon New Carlisle55001 Larrison Blvd, New Carlisle, IN 46552 | Amazon | 2.3K MW | $72.9B | Mar 17, 2028 | 60% confidenceEvidence noteBuildings 19-32 are operational. This is an estimate based on how long Buildings 1-16 took to become operational. In May 2026, the foundation of several buildings and a substation was visible at the site of Buildings 19-32. Buildings 1-16 took 1 year and 10 months to go from a similar state to operational. So we add 1 year and 10 months to May 2026 to get this date estimate. The power capacity is based on an [air quality permit](https://t.co/HsAO7oyKa2) filed in May 2026, and the compute capacity is based on Trainium3 chips. |
| Google Fort Wayne6015 Adams Center Road, Fort Wayne, IN 46806 | 1K MW | $32.7B | Jun 23, 2028 | 60% confidenceEvidence noteEstimated operational date of Building 6. Based on previous buildings being separated by about 5 months. |
Planned capacity is estimated, not metered utility load. Planned does not mean permitted, financed, constructed, or energized. Open each project and methodology before using these figures.