Skip to content

Datacenters

State AI Infrastructure pipeline

6 places ranked by reviewed announced AI infrastructure projects.
Recorded Oct 25, 2026Checked dailyHow this board is measuredCSV / JSON

2 projects

Pennsylvania ranks first

Reviewed announced AI infrastructure projects

6

Places ranked

Oct 25

Snapshot recorded

2026 · Checked daily

Follow changes

All 6 places by reviewed announced AI infrastructure projects

Pennsylvania leads at 2 projects; the middle of the board sits at 1.

Ahead of second place
1
Held by the top three
57%
Middle of the board
1
Rank, name and reviewed announced AI infrastructure projectsMiddle 1
  1. 1Pennsylvania2 projects
  2. 2Indiana1 projects
  3. 3Louisiana1 projects
  4. 4North Carolina1 projects
  5. 5Wisconsin1 projects
  6. 6Mississippi1 projects

building: 0 on 4 of 6 rows · energized: 0 on 5 of 6 rows · 100% confidence across rows.

State AI Infrastructure pipeline current rankings
RankNameReviewed announced AI infrastructure projectsStatus as ofWhy
01Pennsylvania2 projects2025-07-15This rank
02Indiana1 projects2025-11-24This rank
03Louisiana1 projects2026-07-13This rank
04North Carolina1 projects2025-10-30This rank
05Wisconsin1 projects2026-06-23This rank
06Mississippi1 projects2025-11-20Showing

Why this rank

Mississippi on State AI Infrastructure Pipeline

Some explanation inputs are unavailable. Not published: the evidence frozen with this snapshot.

Ranks states by distinct project identities in a bounded first-party evidence universe, with verified development stage and separately scoped capacity references.

6

Rank on this board

1 operators

Score

1

Inputs behind the score

100% confidence · 1 of 1 components evidenced

What the score is built from

1 of 1 evidenced

Every component evidenced · 1 evidence record each

Components of Mississippi's score
ComponentValueContribution
AI infrastructure project11

Unchanged since the previous snapshot

No change in rank

No component moved since the previous snapshot.

Where each number comes from

11 public records
  • Latest reviewed announcement dateLatest reviewed infrastructure announcement date · observed Oct 25, 2026, 3:50 AM UTC2025-11-20100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"923784e3-cd20-48c1-9361-aed41bbeded4","sourceArtifactIds":["37e88612-a943-48cb-b259-94599edd5f83"],"sourceObservationIds":["16fa9da3-6c27-4bbc-bea1-59822bb5d489"]}
  • Latest reviewed project-status dateLatest reviewed project status date · observed Oct 25, 2026, 3:50 AM UTC2025-11-20100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"923784e3-cd20-48c1-9361-aed41bbeded4","sourceArtifactIds":["37e88612-a943-48cb-b259-94599edd5f83"],"sourceObservationIds":["16fa9da3-6c27-4bbc-bea1-59822bb5d489"]}
  • Largest single disclosed reference amountMax single disclosed infrastructure reference amount · observed Oct 25, 2026, 3:50 AM UTC$3B100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"923784e3-cd20-48c1-9361-aed41bbeded4","sourceArtifactIds":["37e88612-a943-48cb-b259-94599edd5f83"],"sourceObservationIds":["16fa9da3-6c27-4bbc-bea1-59822bb5d489"]}
  • Projects with reviewed capacity disclosuresProjects with reviewed capacity disclosure · observed Oct 25, 2026, 3:50 AM UTC0 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"923784e3-cd20-48c1-9361-aed41bbeded4","sourceArtifactIds":["37e88612-a943-48cb-b259-94599edd5f83"],"sourceObservationIds":["16fa9da3-6c27-4bbc-bea1-59822bb5d489"]}
  • Distinct operators in reviewed announcementsAI infrastructure operator · observed Oct 25, 2026, 3:50 AM UTC1 operators100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"923784e3-cd20-48c1-9361-aed41bbeded4","sourceArtifactIds":["37e88612-a943-48cb-b259-94599edd5f83"],"sourceObservationIds":["16fa9da3-6c27-4bbc-bea1-59822bb5d489"]}
  • Reviewed announced AI infrastructure projectsAI infrastructure project · observed Oct 25, 2026, 3:50 AM UTC1 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"923784e3-cd20-48c1-9361-aed41bbeded4","sourceArtifactIds":["37e88612-a943-48cb-b259-94599edd5f83"],"sourceObservationIds":["16fa9da3-6c27-4bbc-bea1-59822bb5d489"]}
  • Reviewed announced projectsAnnounced project · observed Oct 25, 2026, 3:50 AM UTC1 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"923784e3-cd20-48c1-9361-aed41bbeded4","sourceArtifactIds":["37e88612-a943-48cb-b259-94599edd5f83"],"sourceObservationIds":["16fa9da3-6c27-4bbc-bea1-59822bb5d489"]}
  • Reviewed energized projectsEnergized project · observed Oct 25, 2026, 3:50 AM UTC0 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"923784e3-cd20-48c1-9361-aed41bbeded4","sourceArtifactIds":["37e88612-a943-48cb-b259-94599edd5f83"],"sourceObservationIds":["16fa9da3-6c27-4bbc-bea1-59822bb5d489"]}
  • Reviewed permitted projectsPermitted project · observed Oct 25, 2026, 3:50 AM UTC0 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"923784e3-cd20-48c1-9361-aed41bbeded4","sourceArtifactIds":["37e88612-a943-48cb-b259-94599edd5f83"],"sourceObservationIds":["16fa9da3-6c27-4bbc-bea1-59822bb5d489"]}
  • Reviewed projects under constructionUnder construction project · observed Oct 25, 2026, 3:50 AM UTC0 projects100% confidence
    Source
    Rank.ai reviewed state infrastructure rollup
    Grade
    B
    Freshness
    fresh
    Locator
    {"sourceUrls":["https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment"],"sourceSnapshotId":"923784e3-cd20-48c1-9361-aed41bbeded4","sourceArtifactIds":["37e88612-a943-48cb-b259-94599edd5f83"],"sourceObservationIds":["16fa9da3-6c27-4bbc-bea1-59822bb5d489"]}
  • Disclosed infrastructure investment reference amountSource project:amazon warren county datacenter · observed Oct 25, 2026, 3:50 AM UTC$3B100% confidence
    Source
    Official Company AI Infrastructure Disclosures
    Grade
    A
    Freshness
    fresh
    Locator
    {"canonicalUrl":"https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment","anchorsVerified":true,"contentHashKind":"sha256_evidence_bundle","statusSourceUrl":"https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment","sourceTextStored":false,"statusContentHash":"8beed3f388bff53691f2902b18bf510aa100b78020b6cec459b30eba1fc7774a","primaryContentHash":"8beed3f388bff53691f2902b18bf510aa100b78020b6cec459b30eba1fc7774a","requiredFactAnchors":["3 billion","warren county"],"statusAnchorsVerified":true,"statusRequiredFactAnchors":["plans to invest","new data center campus"]}
    Open the source
State AI Infrastructure Pipeline, version 1-us-state-v2-2026-07-27-2026-07-27-v270 observations · 2 sources · quality passed
Snapshot
ffd8bba3-980e-40b1-b12b-08d74cfc0ee7
Data hash
f1e05ac85a56f1cff652c8535e1b2288d9d23663d6b8cc8afc1dec168fe5b14f
Method hash
d1e838d7cf03c77567d842e067466a2b1b2992b1521db50619edf0991e07cb61

More in Datacenters

Operating, under-construction, and planned AI capacity by place and operator.

3 boards
Operational AI data centers

Epoch AI current positive-capacity facilities ranked by estimated total facility MW, with 2025-dollar capex and calculated H100-equivalent compute beside every row.

Enter your website. In about two minutes, Rank.ai asks ChatGPT, Claude and Gemini 12 questions your customers ask and grades how often they name you.

  • Your grade out of 100How often AI names you, cites your site, and how high it ranks you.
  • Who gets namedEvery competitor in the answers, most named first.
  • The pages AI readsThe sources behind each answer.
  • Three fixesWhat to fix first, with a brief for the first article.