Latest future-dated Epoch AI capacity milestone per facility, with planned MW, 2025-dollar capex, H100e, construction status, evidence, and uncertainty preserved.
Operational AI data centers
68 infrastructures ranked by facility power.
Colossus 2 is out in front at 946 MW.
68 infrastructureschecked Sep 9, 2026, 12:00 PM UTCdailyhow we measure this →CSV / JSON
Colossus 2
946 MWfacility power
- Ahead of second place
- 36
- Held by the top three
- 19%
- Middle of the board
- 152
- Below half the leader
- 64 of 68
Meta Sarpy
Epoch current data-center records with positive current power, capital cost, and H100-equivalent values.
Some explanation inputs are unavailable Missing: publicFrozenEvidence, comparablePriorRanking.
- Published rank
- #51
- Score
- 80 MW
- Sample size
- 3
70% confidence · 38% component coverage · as of Sep 9, 2026, 12:00 PM UTC
Component ledger
| Component | Value | Weight | Contribution | Evidence | Status |
|---|---|---|---|---|---|
| attribution | Source: Epoch AI (CC BY 4.0) | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| epoch AI data center capex 2025 USD | 3030560000.0000000000 | 0% | 0 | 1 | available |
| epoch AI data center facility power MW | 80.0000000000 | 100% | 80 | 1 | available |
| epoch AI data center h100 equivalents | 91965.6392117231 | 0% | 0 | 1 | available |
| evidence | — | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| missingIsZero | 0 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| rawValue | 80.0000000000 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| score | 80.0000000000 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
up since prior snapshot
component_history_unavailable
No component moved since the prior snapshot.
Source trail
Facility capital costepoch AI data center capex 2025 USD · observed Sep 9, 2026, 12:00 PM UTC$3.03B70% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":86,"downloadUrl":"https://epoch.ai/data/data_centers/data_centers.csv","releaseDate":"2026-09-09","contentHashKind":"sha256_raw_bytes","expectedColumns":["Name","Current H100 equivalents","Current power (MW)","Current total capital cost (2025 USD billions)","Owner","Users","Selected Sources","Calculations sheet","Project","Current chip types","All chip types","Investors","Construction companies","Energy companies","Country","Address"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"2d6fb39d3552f0fe53ac7e7b0bccb607a9efbb705036189f9776764048656c60"}
Facility powerepoch AI data center facility power MW · observed Sep 9, 2026, 12:00 PM UTC80 MW70% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":86,"downloadUrl":"https://epoch.ai/data/data_centers/data_centers.csv","releaseDate":"2026-09-09","contentHashKind":"sha256_raw_bytes","expectedColumns":["Name","Current H100 equivalents","Current power (MW)","Current total capital cost (2025 USD billions)","Owner","Users","Selected Sources","Calculations sheet","Project","Current chip types","All chip types","Investors","Construction companies","Energy companies","Country","Address"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"2d6fb39d3552f0fe53ac7e7b0bccb607a9efbb705036189f9776764048656c60"}
H100-equivalent computeepoch AI data center h100 equivalents · observed Sep 9, 2026, 12:00 PM UTC91,965.639 H100e70% confidence
- Source
- Epoch AI open datasets
- Grade
- A
- Freshness
- fresh
- Locator
{"rowCount":86,"downloadUrl":"https://epoch.ai/data/data_centers/data_centers.csv","releaseDate":"2026-09-09","contentHashKind":"sha256_raw_bytes","expectedColumns":["Name","Current H100 equivalents","Current power (MW)","Current total capital cost (2025 USD billions)","Owner","Users","Selected Sources","Calculations sheet","Project","Current chip types","All chip types","Investors","Construction companies","Energy companies","Country","Address"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"2d6fb39d3552f0fe53ac7e7b0bccb607a9efbb705036189f9776764048656c60"}
More in Datacenters
Operating, under-construction, and planned AI capacity by place and operator.
Reviewed first-party project announcements ranked by disclosed reference amount, with qualifiers preserved and actual spend explicitly separated.
A reviewed first-party project cohort with announced, under-construction, and energized stages plus separately scoped disclosed datacenter and compute MW. Permits and grid queues are never inferred.