RANK.AI DATA / LATEST PUBLICATION

Operational AI data centers

68 infrastructures ranked by facility power.
Colossus 2 is out in front at 946 MW.

68 infrastructureschecked Sep 9, 2026, 12:00 PM UTCdailyhow we measure this →CSV / JSON

Follow changes
In front today

Colossus 2

946 MWfacility power

Ahead of second place
36
Held by the top three
19%
Middle of the board
152
Below half the leader
64 of 68
Highest 946 MWMiddle 152
1. Colossus 2 — 946 MW2. Anthropic-Amazon New Carlisle — 910 MW3. Microsoft Fairwater Atlanta — 636 MW4. Meta Prometheus — 562 MW5. Google New Albany — 453 MW6. OpenAI Stargate Abilene — 421 MW7. Microsoft Fairwater Wisconsin — 369 MW8. Google Pryor (North) — 368 MW9. Colossus 1 — 340 MW10. Google Columbus — 303 MW11. Amazon Madison Mega Site — 284 MW12. CoreWeave Denton TX — 262 MW13. Huawei Horinger — 241.8 MW14. DayOne Nusajaya — 240 MW15. Google Bristow — 238 MW16. QTS Richmond 1 — 238 MW17. Google Council Bluffs (East) — 237 MW18. Google Omaha — 237 MW19. Google Papillion — 237 MW20. Amazon Ridgeland — 228 MW21. VNET Bayin Ulanqab — 221 MW22. AWS New Albany — 213 MW23. Microsoft Goodyear — 202 MW24. Microsoft Project Osmium — 190 MW25. Google Mesa — 183 MW26. Meta-QTS Hillsboro 2 — 180 MW27. QTS Richmond 2 — 180 MW28. Meta Jeffersonville — 178 MW29. Meta Rosemount — 178 MW30. Alibaba Zhangbei — 169 MW31. Google Storey County — 161 MW32. Google The Dalles — 154 MW33. Meta Montgomery — 153 MW34. Meta Cheyenne — 152 MW35. Meta Kuna — 152 MW36. Meta Temple — 152 MW37. Meta Huntsville — 146 MW38. QTS Richmond 3 — 144 MW39. Meta Aiken — 142 MW40. Google Lincoln — 141 MW41. Google Lancaster — 137 MW42. Meta Eagle Mountain — 133 MW43. AWS Berwick — 108 MW44. Google Kansas City East — 105 MW45. Google Midlothian — 103 MW46. Google Waltham Cross — 88 MW47. Meta Gallatin — 87 MW48. Meta Los Lunas — 87 MW49. STACK Infrastructure NVA02 — 85 MW50. CoreWeave Chester VA — 82 MW51. Meta Sarpy — 80 MW52. Google Arcola — 77 MW53. Google Red Oak — 77 MW54. Microsoft SAT40 — 75 MW55. Oracle Batam — 72 MW56. CoreWeave Ellendale ND — 68 MW57. CoreWeave Marble NC — 65 MW58. Stream Phoenix — 64 MW59. Core42 Lake Mariner — 58 MW60. Microsoft-Nebius New Jersey — 50 MW61. Microsoft SAT14 — 47 MW62. Anthropic Lake Mariner — 42 MW63. CoreWeave Norway — 42 MW64. Southgate Melbourne — 41 MW65. Start Campus Sines Data Campus — 33 MW66. Vantage TX1 — 32 MW67. CoreWeave Dalton 1 & 2 — 28 MW68. xAI QTS Atlanta — 17.33 MW
Rank 1one bar per published rowRank 68
WHY THIS RANK

EXPLANATION UNAVAILABLE

The explanation service did not return a publishable result.

More in Datacenters

Operating, under-construction, and planned AI capacity by place and operator.

3 live tables
Planned AI data center capacity

Latest future-dated Epoch AI capacity milestone per facility, with planned MW, 2025-dollar capex, H100e, construction status, evidence, and uncertainty preserved.

State AI infrastructure pipeline

A reviewed first-party project cohort with announced, under-construction, and energized stages plus separately scoped disclosed datacenter and compute MW. Permits and grid queues are never inferred.