Latest future dated capacity milestone per Epoch AI data center, ranked by estimated facility power with capex and H100e context.
| Rank | Entity | Signal | Facility power | Epoch Ai Data Center Capex 2025 Usd | Epoch Ai Data Center H100 Equivalents | Confidence | N | 7D | Trend | Explain | Compare |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | Microsoft Fairwater Wisconsininfrastructure | Epoch AI release: 2026-07-25. | 2,715 MW | $85.73B | 4.5M H100e | 60% | 3 | Why this rank | |||
| 02 | Anthropic-Amazon New Carlisleinfrastructure | Epoch AI release: 2026-07-25. | 2,310 MW | $72.92B | 1.7M H100e | 60% | 3 | Why this rank | |||
| 03 | Meta Hyperioninfrastructure | Epoch AI release: 2026-07-25. | 2,262 MW | $63.49B | 3.7M H100e | 60% | 3 | Why this rank | |||
| 04 | OpenAI Stargate New Mexicoinfrastructure | Epoch AI release: 2026-07-25. | 2,210 MW | $59.78B | 4.6M H100e | 60% | 3 | Why this rank | |||
| 05 | OpenAI Stargate Shackelfordinfrastructure | Epoch AI release: 2026-07-25. | 1,960 MW | $53.03B | 4M H100e | 60% | 3 | Why this rank | |||
| 06 | QTS Cedar Rapidsinfrastructure | Epoch AI release: 2026-07-25. | 1,587 MW | $42.92B | 3.5M H100e | 60% | 3 | Why this rank | |||
| 07 | OpenAI Stargate UAEinfrastructure | Epoch AI release: 2026-07-25. | 1,400 MW | $37.88B | 2M H100e | 60% | 3 | Why this rank | |||
| 08 | OpenAI Stargate Michiganinfrastructure | Epoch AI release: 2026-07-25. | 1,383 MW | $37.43B | 2.9M H100e | 60% | 3 | Why this rank | |||
| 09 | OpenAI Stargate Wisconsininfrastructure | Epoch AI release: 2026-07-25. | 1,300 MW | $34.17B | 2.6M H100e | 60% | 3 | Why this rank | |||
| 10 | Goodnightinfrastructure | Epoch AI release: 2026-07-25. | 1,294.1 MW | $38.11B | 2M H100e | 60% | 3 | Why this rank | |||
| 11 | OpenAI Stargate Milaminfrastructure | Epoch AI release: 2026-07-25. | 1,200 MW | $32.46B | 2.5M H100e | 60% | 3 | Why this rank | |||
| 12 | OpenAI Stargate Abileneinfrastructure | Epoch AI release: 2026-07-25. | 1,180 MW | $31.93B | 1M H100e | 60% | 3 | Why this rank | |||
| 13 | Meta Prometheusinfrastructure | Epoch AI release: 2026-07-25. | 1,110 MW | $32.35B | 1M H100e | 60% | 3 | Why this rank | |||
| 14 | Google Fort Wayneinfrastructure | Epoch AI release: 2026-07-25. | 1,035 MW | $32.69B | 4.7M H100e | 60% | 3 | Why this rank | |||
| 15 | Amazon Ridgelandinfrastructure | Epoch AI release: 2026-07-25. | 1,008 MW | $31.82B | 788.3K H100e | 60% | 3 | Why this rank | |||
| 16 | Crusoe Abilene Expansioninfrastructure | Epoch AI release: 2026-07-25. | 941 MW | $25.46B | 1.5M H100e | 60% | 3 | Why this rank | |||
| 17 | Amazon Madison Mega Siteinfrastructure | Epoch AI release: 2026-07-25. | 819 MW | $25.87B | 514.4K H100e | 60% | 3 | Why this rank | |||
| 18 | Coreweave Heliosinfrastructure | Epoch AI release: 2026-07-25. | 800 MW | $20B | 638.2K H100e | 60% | 3 | Why this rank | |||
| 19 | VNET Bayin Ulanqabinfrastructure | Epoch AI release: 2026-07-25. | 798 MW | $26.52B | 388.1K H100e | 60% | 3 | Why this rank | |||
| 20 | DayOne Nusajayainfrastructure | Epoch AI release: 2026-07-25. | 662 MW | $17.92B | 583.8K H100e | 60% | 3 | Why this rank | |||
| 21 | Google New Albanyinfrastructure | Epoch AI release: 2026-07-25. | 543 MW | $17.16B | 616.5K H100e | 60% | 3 | Why this rank | |||
| 22 | CoreWeave Ellendale NDinfrastructure | Epoch AI release: 2026-07-25. | 520 MW | $15.15B | 505.3K H100e | 60% | 3 | Why this rank | |||
| 23 | Fluidstack Lake Marinerinfrastructure | Epoch AI release: 2026-07-25. | 509 MW | $16.52B | 1M H100e | 60% | 3 | Why this rank | |||
| 24 | STACK Infrastructure NVA02infrastructure | Epoch AI release: 2026-07-25. | 487 MW | $13.18B | 250.6K H100e | 60% | 3 | Why this rank | |||
| 25 | Google Omahainfrastructure | Epoch AI release: 2026-07-25. | 474 MW | $14.96B | 1.1M H100e | 60% | 3 | Why this rank | |||
| 26 | Meta Montgomeryinfrastructure | Epoch AI release: 2026-07-25. | 465 MW | $13.56B | 407.5K H100e | 60% | 3 | Why this rank | |||
| 27 | Google Columbusinfrastructure | Epoch AI release: 2026-07-25. | 464 MW | $14.62B | 707.4K H100e | 60% | 3 | Why this rank | |||
| 28 | Google Pryor (North)infrastructure | Epoch AI release: 2026-07-25. | 442 MW | $13.94B | 763K H100e | 60% | 3 | Viewing why | |||
| 29 | Google Storey Countyinfrastructure | Epoch AI release: 2026-07-25. | 389 MW | $11.36B | 651.8K H100e | 60% | 3 | Why this rank | |||
| 30 | Google Lincolninfrastructure | Epoch AI release: 2026-07-25. | 339 MW | $10.72B | 869.1K H100e | 60% | 3 | Why this rank | |||
| 31 | QTS Richmond 3infrastructure | Epoch AI release: 2026-07-25. | 336 MW | $9.09B | 291.1K H100e | 60% | 3 | Why this rank | |||
| 32 | Google Cedar Rapidsinfrastructure | Epoch AI release: 2026-07-25. | 314 MW | $9.89B | 816.3K H100e | 60% | 3 | Why this rank | |||
| 33 | Start Campus Sines Data Campusinfrastructure | Epoch AI release: 2026-07-25. | 280 MW | $8.83B | 472.5K H100e | 60% | 3 | Why this rank | |||
| 34 | Stream Phoenixinfrastructure | Epoch AI release: 2026-07-25. | 267 MW | $8.33B | 160.2K H100e | 60% | 3 | Why this rank | |||
| 35 | Meta Cheyenneinfrastructure | Epoch AI release: 2026-07-25. | 264 MW | $8.33B | 251.1K H100e | 60% | 3 | Why this rank | |||
| 36 | Google Mesainfrastructure | Epoch AI release: 2026-07-25. | 237 MW | $6.93B | 343.1K H100e | 60% | 3 | Why this rank | |||
| 37 | Meta Templeinfrastructure | Epoch AI release: 2026-07-25. | 231 MW | $6.74B | 202.5K H100e | 60% | 3 | Why this rank | |||
| 38 | CoreWeave Chester VAinfrastructure | Epoch AI release: 2026-07-25. | 197 MW | $4.28B | 125.8K H100e | 60% | 3 | Why this rank | |||
| 39 | Google Red Oakinfrastructure | Epoch AI release: 2026-07-25. | 185 MW | $5.83B | 315.8K H100e | 60% | 3 | Why this rank | |||
| 40 | CoreWeave Muskogee OKinfrastructure | Epoch AI release: 2026-07-25. | 181 MW | $5.8B | 198.1K H100e | 60% | 3 | Why this rank | |||
| 41 | Vantage TX1infrastructure | Epoch AI release: 2026-07-25. | 179.2 MW | $4.85B | 154.6K H100e | 60% | 3 | Why this rank | |||
| 42 | Google Kansas City Eastinfrastructure | Epoch AI release: 2026-07-25. | 126 MW | $3.98B | 244.6K H100e | 60% | 3 | Why this rank | |||
| 43 | Meta Sarpyinfrastructure | Epoch AI release: 2026-07-25. | 105 MW | $3.03B | 92K H100e | 60% | 3 | Why this rank | |||
| 44 | Southgate Melbourneinfrastructure | Epoch AI release: 2026-07-25. | 57 MW | $1.55B | 46.5K H100e | 60% | 3 | Why this rank |
Historical data is not available for this snapshot yet.
Latest future-dated timeline milestone per center after the dataset release date, requiring positive power, capital cost, and H100-equivalent values.
Some explanation inputs are unavailable Missing: publicFrozenEvidence, comparablePriorRanking.
| Component | Value | Weight | Contribution | Evidence | Status |
|---|---|---|---|---|---|
| attribution | Source: Epoch AI (CC BY 4.0) | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
| epoch ai data center capex 2025 usd | 13940576000.0000000000 | 0% | 0 | 1 | available |
| epoch ai data center facility power mw | 442.0000000000 | 100% | 442 | 1 | available |
| epoch ai data center h100 equivalents | 763011.6220313290 | 0% | 0 | 1 | available |
|---|
| evidence | — | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
|---|
| missingIsZero | 0 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
|---|
| rawValue | 442.0000000000 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
|---|
| score | 442.0000000000 | Unavailable | — | 0 | unavailableno_public_frozen_evidence |
|---|
no_prior_published_snapshot
No comparable component drivers were published.
{"rowCount":424,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-07-25","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"8975f0376b161ea94138e8cda285dc8dc9befdd379409252ddca0939553045d2"}{"rowCount":424,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-07-25","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"8975f0376b161ea94138e8cda285dc8dc9befdd379409252ddca0939553045d2"}{"rowCount":424,"downloadUrl":"https://epoch.ai/data/data_centers/data_center_timelines.csv","releaseDate":"2026-07-25","contentHashKind":"sha256_raw_bytes","expectedColumns":["Data center","Date","Construction status","Buildings operational","IT power (MW)","Power (MW)","H100 equivalents","Performance (8-bit OP/s)","Total capital cost (2025 USD billions)","Compute cost (2025 USD billions)","Construction cost (2025 USD billions)","Annual operating cost (2025 USD billions)","Water use (MGD)","Current H100 equivalents (from Data center)"],"documentationUrl":"https://epoch.ai/data/data-centers-documentation/downloads","documentationHash":"8975f0376b161ea94138e8cda285dc8dc9befdd379409252ddca0939553045d2"}